1. What is the primary purpose of NYC Building Code Chapter 33?
mn mn mn mn mn mn mn mn mn mn mn
• A) Regulate building materials
mn mn mn
• B) Provide safeguards during construction and demolition operations
mn mn mn mn mn mn mn
• C) Establish fire resistance ratings
mn mn mn mn
• D) Define occupancy classifications
mn mn mn
Correct Answer: Bmn mn
Rationale: Chapter 33, titled "Safeguards During Construction or Demolition," establis
mn mn mn mn mn mn mn mn mn
hes minimum requirements for protecting the public and workers during building ope
mn mn mn mn mn mn mn mn mn mn mn
rations . mn
2. According to BC 3310.1, a Site Safety Manager (SSM) is required for:
mn mn mn mn mn mn mn mn mn mn mn mn
• A) Any building over 5 stories
mn mn mn mn mn
• B) Major buildings – 15 stories or more, OR 200 feet or more in height
mn mn mn mn mn mn mn mn mn mn mn mn mn mn
• C) All residential construction
mn mn mn
• D) Buildings with more than 50 workers
mn mn mn mn mn mn
,Correct Answer: B mn mn
Rationale: BC §3310.1 explicitly requires a Site Safety Manager for major buildings def
mn mn mn mn mn mn mn mn mn mn mn mn
ined as 15+ stories or 200+ feet in height. A Site Safety Coordinator may be required
mn mn mn mn mn mn mn mn mn mn mn mn mn mn mn mn
for smaller thresholds (10 stories/125 feet) .
mn mn mn mn mn mn
3. A building with a footprint of 100,000 square feet or more is classified as:
mn mn mn mn mn mn mn mn mn mn mn mn mn mn
• A) A minor building
mn mn mn
• B) A major building regardless of height
mn mn mn mn mn mn
• C) A residential building only
mn mn mn mn
• D) Exempt from site safety requirements
mn mn mn mn mn
Correct Answer: B mn mn
Rationale: BC §3310.1 classifies any building with a footprint of 100,000 square feet o
mn mn mn mn mn mn mn mn mn mn mn mn mn
r more as a "major building" requiring a Site Safety Manager .
mn mn mn mn mn mn mn mn mn mn mn
4. What is the primary responsibility of a Site Safety Manager on a major constr
mn mn mn mn mn mn mn mn mn mn mn mn mn mn
uction project? mn
• A) Approve architectural drawings
mn mn mn
• B) Manage payroll operations
mn mn mn
• C) Monitor and enforce site safety requirements and code compliance
mn mn mn mn mn mn mn mn mn
• D) Perform all construction work personally
mn mn mn mn mn
Correct Answer: C mn mn
,Rationale: The Site Safety Manager is responsible for implementing and overseeing si
mn mn mn mn mn mn mn mn mn mn mn
te safety measures, identifying hazards, and ensuring compliance with applicable regul
mn mn mn mn mn mn mn mn mn mn
ations and approved site safety plans .
mn mn mn mn mn mn
5. Which NYC agency administers and enforces site safety requirements on cons
mn mn mn mn mn mn mn mn mn mn mn
truction sites? mn
• A) FDNYmn
• B) NYSDOL
mn
• C) OSHAmn
• D) NYC Department of Buildings (DOB)
mn mn mn mn mn
Correct Answer: D mn mn
Rationale: The NYC Department of Buildings is responsible for enforcing construction
mn mn mn mn mn mn mn mn mn mn m
safety and site safety regulations within New York City .
n mn mn mn mn mn mn mn mn mn
6. The Site Safety Log must be:
mn mn mn mn mn mn
• A) Kept at the contractor's main office
mn mn mn mn mn mn
• B) Kept at the site at all times
mn mn mn mn mn mn mn
• C) Stored with the FDNY
mn mn mn mn
• D) Maintained electronically only off-site
mn mn mn mn
Correct Answer: B mn mn
, Rationale: 1 RCNY §3301- mn mn mn
02 requires the Site Safety Log to be maintained on the construction site and availabl
mn mn mn mn mn mn mn mn mn mn mn mn mn mn
e for inspection by DOB at all times .
mn mn mn mn mn mn mn mn
7. How long must the Site Safety Log be retained after project completion?
mn mn mn mn mn mn mn mn mn mn mn mn
• A) 6 months
mn mn
• B) 1 year
mn mn
• C) 3 years
mn mn
• D) 5 years
mn mn
Correct Answer: C mn mn
Rationale: The Site Safety Log must be kept for a minimum of 3 years after the final
mn mn mn mn mn mn mn mn mn mn mn mn mn mn mn mn mn
permit is signed off or project completion .
mn mn mn mn mn mn mn
8. Failure to maintain a Site Safety Log on site can result in:
mn mn mn mn mn mn mn mn mn mn mn mn
• A) A warning only
mn mn mn
• B) A stop-work order and fines
mn mn mn mn mn
• C) Permit fee reduction
mn mn mn
• D) No penalty
mn mn
Correct Answer: B mn mn
Rationale: DOB inspectors may issue a stop-
mn mn mn mn mn mn
work order and impose civil penalties for failure to produce or maintain the required
mn mn mn mn mn mn mn mn mn mn mn mn mn mn
Site Safety Log .