Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Design and Construction Contracting (MCPPO 2) UPDATED ACTUAL Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 15 pages

Design and Construction Contracting (MCPPO 2) UPDATED ACTUAL Questions and CORRECT Answers

Content preview

Design and Construction Contracting (MCPPO 2)
UPDATED ACTUAL Questions and CORRECT Answers

Question: 1. Stages of Public Construction

Answer:

The design and construction contracting process for public construction projects in
Massachusetts typically involves three stages: planning, design and construction

Question: 2. This project delivery method is often referred to as:

Answer:

the design-bid-build delivery method. Two alternative project delivery methods for public
construction projects, construction management at risk and design-build, are discussed
elsewhere in these seminar materials.

Question: 3. Key Roles in a Design-Bid-Build Process

Answer:

The design-bid-build process in Massachusetts involves three key roles: the owner, the
designer and the contractor.

Question: 4. Public Owner

Answer:

The public owner, or awarding authority, is responsible for defining the project scope,
budget, and schedule; procuring and managing the project design and construction
services; paying for the project; and operating and maintaining the completed facility. No
matter how many of these tasks are contracted out to private firms, the owner is always
responsible and accountable for the project.

Question: 5. Owner's Project Manager

Answer:

Before contracting for design services in connection with a public building contract
estimated to cost $1.5 million or more, your jurisdiction is required to contract with or
assign an OPM to serve as your jurisdiction's agent during the planning, design and
implementation of the construction work. Thus, the OPM role included construction
management. The OPM must be independent of the project designer, general contractor,
or any subcontractor.

Question: 6. You may assign an employee to serve as the OPM:

Answer:

, only if that employee meets or exceeds these requirements and has building construction
and supervision experience relating to projects of similar size and scope of complexity as
the project to which the employee is assigned. If you elect to contract for the services of
the OPM, you are required to use a qualifications-based selection process, which means
that the OPM must be competitively selected on the basis of qualifications, without price
competition.

Question: 7. Contractor

Answer:

The selected contractor's job is to provide the means, methods, and materials to
construct the facility in accordance with the plans and specifications, a job that often
entails subcontracting out specialized portions of the construction work to
subcontractors.

Question: 8. Qualifications-Based Selection of Designers

Answer:

"Qualifications-based selection," or "QBS." refers to a process by which designers
compete for public contracts on the basis of their qualifications, without fee competition.
The awarding authority either sets the fee or negotiates the fee with the highest-ranked
applicant.

Question: 9. Contractor and Subcontractor Certification

Answer:

Under Massachusetts law, public building contracts and public works contracts may be
awarded only to responsible and eligible contractors.

Question: 10. Under M.G.L. c. 149, "responsible" means:

Answer:

Demonstrably possessing the skill, ability and integrity necessary to faithfully perform
the work called for by a particular contract, based upon a determination of competent
workmanship and financial soundness in accordance with the provisions of section
forty-four D of this chapter

Question: 11. "Eligible" means:

Answer:

Able to meet all requirements for bidders or offerers set forth in sections forty-four A
through forty-four H of this chapter and not debarred from bidding under section
forty-four C of this chapter or any other applicable law, and who shall certify that he is
able to furnish labor that can work in harmony with all other elements of labor employed

Document information

Uploaded on
July 18, 2026
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(230)
Sold
1507
Followers
106
Items
107180
Last sold
5 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions