BICSI Technician Quiz Questions and
Answers Latest Version Top Rated
Project schedules should be updated at least ______________ once the project
has started,
Weekly
The size and route of sanitary sewer lines are indicated in the
________ drawings.
P Drawing
Which of the following documents is used to track daily activities at the work
site?
Project Log
Which of the following is submitted to request clarification, supplemental
information, or approval of material substitutions?
RFI Form
M drawings indicate the size and route of:
Air Handler Units, Chilled Water Piping, Refrigerant Piping, HVAC System Ducts
Which of the following testers should be used for optical fiber identification?
Visual Fault Locator (VFL)
What is the first step that you should take to verify the existing infrastructure
before you begin a retrofit?
Review the existing documentation with the customer.
A graphical representation of a building space, or object prepared with adequate
detail to convey design information in a manner to serve as a guide for
construction.
A Drawing
A graphical representation of the electrical components of a construction project
(e.g., power distribution, lighting).
E Drawing
Abbreviation for fire protection drawings
FP Drawing
Abbreviation for mechanical drawings.
M Drawing
Abbreviation for plumbing drawings
P Drawing
Abbreviation for structural drawings
S Drawing
This document covers the requirements for the ICT systems team and lists all of
the elements of the installation.
Scope of Work (SOW)
Abbreviation for telecommunications, security, and audiovisual drawings
T Drawing
, Layer of a telecommunication drawing that contains campus or site information
such as exterior pathways and interbuilding systems
T0 Layer
Layer of a telecommunication drawing that contains building information.
T1 Layer
Layer of a telecommunication drawing that contains serving zone information
T2 Layer
Layer of a telecommunication drawing that contains information about
telecommunications rooms.
T3 Layer
Layer of a telecommunication drawing that contains the detail drawings.
T4 Layer
Layer of a telecommunication drawing that contains schedules and spreadsheets.
T5 Layer
A list of the quantity and specific types of materials to be used on a project. This
list also should consider miscellaneous hardware.
BOM
Abbreviation for operations and maintenance
O&M
Any number of safety apparatuses worn or used by an individual (e.g., hard hat,
protective eyewear, gloves, clothing) that shield against possible injury while
performing tasks.
PPE
A document that provides detailed statements and descriptions of the work
content for the project requirements.
SOW
What are the three basic locations for storing materials?
Company-controlled location, At the work site, With the distributor
True or False: After completing the site survey and formulating a project
implementation plan, the designated ICT systems installation PM should hold an
initial meeting with the entire ICT systems installation team.
True
Which meeting should be held after the initial meeting and should include the
cabling installation team and appropriate contractors?
Pre-Installation Meeting
The progress meeting should only occur once a month
False
What describes the manpower and mobilization in terms of responsibility, skill
level, certification level and head count?
Project Plan
The building official, electrical inspector, fire marshal, or other individuals or
entities responsible for interpretation and enforcement of local building and
electrical codes.
Authority Having Jurisdiction (AHJ)
Answers Latest Version Top Rated
Project schedules should be updated at least ______________ once the project
has started,
Weekly
The size and route of sanitary sewer lines are indicated in the
________ drawings.
P Drawing
Which of the following documents is used to track daily activities at the work
site?
Project Log
Which of the following is submitted to request clarification, supplemental
information, or approval of material substitutions?
RFI Form
M drawings indicate the size and route of:
Air Handler Units, Chilled Water Piping, Refrigerant Piping, HVAC System Ducts
Which of the following testers should be used for optical fiber identification?
Visual Fault Locator (VFL)
What is the first step that you should take to verify the existing infrastructure
before you begin a retrofit?
Review the existing documentation with the customer.
A graphical representation of a building space, or object prepared with adequate
detail to convey design information in a manner to serve as a guide for
construction.
A Drawing
A graphical representation of the electrical components of a construction project
(e.g., power distribution, lighting).
E Drawing
Abbreviation for fire protection drawings
FP Drawing
Abbreviation for mechanical drawings.
M Drawing
Abbreviation for plumbing drawings
P Drawing
Abbreviation for structural drawings
S Drawing
This document covers the requirements for the ICT systems team and lists all of
the elements of the installation.
Scope of Work (SOW)
Abbreviation for telecommunications, security, and audiovisual drawings
T Drawing
, Layer of a telecommunication drawing that contains campus or site information
such as exterior pathways and interbuilding systems
T0 Layer
Layer of a telecommunication drawing that contains building information.
T1 Layer
Layer of a telecommunication drawing that contains serving zone information
T2 Layer
Layer of a telecommunication drawing that contains information about
telecommunications rooms.
T3 Layer
Layer of a telecommunication drawing that contains the detail drawings.
T4 Layer
Layer of a telecommunication drawing that contains schedules and spreadsheets.
T5 Layer
A list of the quantity and specific types of materials to be used on a project. This
list also should consider miscellaneous hardware.
BOM
Abbreviation for operations and maintenance
O&M
Any number of safety apparatuses worn or used by an individual (e.g., hard hat,
protective eyewear, gloves, clothing) that shield against possible injury while
performing tasks.
PPE
A document that provides detailed statements and descriptions of the work
content for the project requirements.
SOW
What are the three basic locations for storing materials?
Company-controlled location, At the work site, With the distributor
True or False: After completing the site survey and formulating a project
implementation plan, the designated ICT systems installation PM should hold an
initial meeting with the entire ICT systems installation team.
True
Which meeting should be held after the initial meeting and should include the
cabling installation team and appropriate contractors?
Pre-Installation Meeting
The progress meeting should only occur once a month
False
What describes the manpower and mobilization in terms of responsibility, skill
level, certification level and head count?
Project Plan
The building official, electrical inspector, fire marshal, or other individuals or
entities responsible for interpretation and enforcement of local building and
electrical codes.
Authority Having Jurisdiction (AHJ)