BNSF ROADWAY WORKER PROTECTION EXAM | RAILROAD SAFETY
& COMPLIANCE TRAINING | COMPLETE QUESTIONS WITH 100%
RATED EXPERT SOLUTIONS |2026 LATEST UPDATED
A track outside the limits of a manual interlocking, a control point, or a remotely controlled
Hump Yard - (answer)Which of the following locations permits the use of individual train
detection?
Notify the Train Dispatcher that no employees have been granted authority to jointly occupy the
working limits.
State the name of each employee that he/she has authorized to jointly occupy the working limits
and the time each cleared - (answer)When releasing working limits to the Train Dispatcher the
employee holding authority shall....
(select all that apply)
No - (answer)Forman Brown is by himself and needs to inspect a power switch in Control Point
Beta. Can he use individual train detection as his form of protection?
Forman - (answer)Who has overall responsibility for inspecting and maintaining on-track
equipment assigned to them?
,working limits - (answer)Roadway Workers jointly occupying working limits under the authority
of a Roadway Worker in Charge (RWIC) must report the position of any switches operated to the
RWIC when reporting clear of the...
To refer to a rule, timetable, or special instruction - (answer)Employees may use any electronic
device for this excepted task, if such use does not interfere with any employees performance of
safety related duties
No Part may be filled out in advance - (answer)What part of a Track Authority Form may be
filled out in advance of receiving information from the Train Dispatcher?
Working limits
Track authority Number
Any Restrictions - (answer)For the purpose of double-copying a Track Authority what
information is required to be double copied?
(select all that apply)
True - (answer)Rules governing the use of Railroad-supplied electronic devices do not apply to
the use of railroad radios.
, (True or False)
No - (answer)A track inspector wants to use Individual Train Detection to inspect a switch. Using
the track speed in the timetable determination is made that there is not enough sight distance.
Luckily today there is a 10 mph slow order on the track which allows for plenty of sight distance.
Is the use of individual Train detection authorized in this scenario?
False - (answer)Employees occupying moving On-Track equipment must be securely positioned
and braced at all times to avoid injury in the event of a sudden stop. Occupants may choose but it
is not necessary to occupy a seat when available.
(True or False)
35, 30 - (answer)Passenger type Hi-Rail Vehicles 10,000 lbs. or less gross vehicle weight
(GVWR), must not exceed __________MPH. Other On-Track equipment must not exceed
_______MPH
Train Dispatcher - (answer)Within working limits, when necessary to perform work that may
shunt track circuits, permission must first be obtained from the_________________
& COMPLIANCE TRAINING | COMPLETE QUESTIONS WITH 100%
RATED EXPERT SOLUTIONS |2026 LATEST UPDATED
A track outside the limits of a manual interlocking, a control point, or a remotely controlled
Hump Yard - (answer)Which of the following locations permits the use of individual train
detection?
Notify the Train Dispatcher that no employees have been granted authority to jointly occupy the
working limits.
State the name of each employee that he/she has authorized to jointly occupy the working limits
and the time each cleared - (answer)When releasing working limits to the Train Dispatcher the
employee holding authority shall....
(select all that apply)
No - (answer)Forman Brown is by himself and needs to inspect a power switch in Control Point
Beta. Can he use individual train detection as his form of protection?
Forman - (answer)Who has overall responsibility for inspecting and maintaining on-track
equipment assigned to them?
,working limits - (answer)Roadway Workers jointly occupying working limits under the authority
of a Roadway Worker in Charge (RWIC) must report the position of any switches operated to the
RWIC when reporting clear of the...
To refer to a rule, timetable, or special instruction - (answer)Employees may use any electronic
device for this excepted task, if such use does not interfere with any employees performance of
safety related duties
No Part may be filled out in advance - (answer)What part of a Track Authority Form may be
filled out in advance of receiving information from the Train Dispatcher?
Working limits
Track authority Number
Any Restrictions - (answer)For the purpose of double-copying a Track Authority what
information is required to be double copied?
(select all that apply)
True - (answer)Rules governing the use of Railroad-supplied electronic devices do not apply to
the use of railroad radios.
, (True or False)
No - (answer)A track inspector wants to use Individual Train Detection to inspect a switch. Using
the track speed in the timetable determination is made that there is not enough sight distance.
Luckily today there is a 10 mph slow order on the track which allows for plenty of sight distance.
Is the use of individual Train detection authorized in this scenario?
False - (answer)Employees occupying moving On-Track equipment must be securely positioned
and braced at all times to avoid injury in the event of a sudden stop. Occupants may choose but it
is not necessary to occupy a seat when available.
(True or False)
35, 30 - (answer)Passenger type Hi-Rail Vehicles 10,000 lbs. or less gross vehicle weight
(GVWR), must not exceed __________MPH. Other On-Track equipment must not exceed
_______MPH
Train Dispatcher - (answer)Within working limits, when necessary to perform work that may
shunt track circuits, permission must first be obtained from the_________________