Cost of parking, drives, fences, landscaping, exterior lighting, and irrigation systems.
Give this one a try later!
Site Development Costs
Costs of movable equipment, furnishings, accessories, and window coverings.
Give this one a try later!
Furniture, Fixtures, and Equipment (FF&E)
Includes the standard building code check by the authority having jurisdiction (AHJ)
as well as any other reviews by permitting agencies.
,Give this one a try later!
Agency Review
A building with occupied floors more than 75ft above the lowest level of fire
department vehicle access.
Give this one a try later!
High-Rise Building
The formalized form of mutual understanding about what the architect will do and
what the client will give in return for services rendered.
Give this one a try later!
Contract Documents
Instructs the contractor to proceed with the stated changes in the work, even if the
contractor does not agree with the basis for adjustment in contract sum or contract
time.
Give this one a try later!
Construction Change Directive
,The distance that an occupant would have to travel to get from the most remote point
in the occupied portion of the exit access area, along the natural and unobstructed
path of horizontal and vertical travel, to the entrance to the nearest exit.
Give this one a try later!
Exit Access Travel Distance
Required to ensure that the successful bidder will enter into a contract with the owner.
Give this one a try later!
Bid security
The contractor may decide to speed up the work because the work has fallen behind
the original schedule, the construction company is trying to finish early to collect a
bonus, or they want to move personnel to another job.
Give this one a try later!
Voluntary Acceleration
Process that considers more than just the lowest bid cost, but also factors such as
quality, schedule, and contractor personnel.
Give this one a try later!
, Value-Based Selection (VBS)
The fee available to pay people to do the job after subtracting fees for proffit,
consultants and other expenses.
Give this one a try later!
Total Working Fee
A listed device installed in ducts and air transfer openings that is designed to close
automatically on detection of heat, to resist the passage of flame.
Give this one a try later!
Fire Damper
A physical example of a portion of the work, intended to show exactly how a material,
finish, or piece of equipment will look in the completed job.
Give this one a try later!
Sample
In bid documents: set costs for certain portions of work, based on an individual
quantity.
Give this one a try later!
Site Development Costs
Costs of movable equipment, furnishings, accessories, and window coverings.
Give this one a try later!
Furniture, Fixtures, and Equipment (FF&E)
Includes the standard building code check by the authority having jurisdiction (AHJ)
as well as any other reviews by permitting agencies.
,Give this one a try later!
Agency Review
A building with occupied floors more than 75ft above the lowest level of fire
department vehicle access.
Give this one a try later!
High-Rise Building
The formalized form of mutual understanding about what the architect will do and
what the client will give in return for services rendered.
Give this one a try later!
Contract Documents
Instructs the contractor to proceed with the stated changes in the work, even if the
contractor does not agree with the basis for adjustment in contract sum or contract
time.
Give this one a try later!
Construction Change Directive
,The distance that an occupant would have to travel to get from the most remote point
in the occupied portion of the exit access area, along the natural and unobstructed
path of horizontal and vertical travel, to the entrance to the nearest exit.
Give this one a try later!
Exit Access Travel Distance
Required to ensure that the successful bidder will enter into a contract with the owner.
Give this one a try later!
Bid security
The contractor may decide to speed up the work because the work has fallen behind
the original schedule, the construction company is trying to finish early to collect a
bonus, or they want to move personnel to another job.
Give this one a try later!
Voluntary Acceleration
Process that considers more than just the lowest bid cost, but also factors such as
quality, schedule, and contractor personnel.
Give this one a try later!
, Value-Based Selection (VBS)
The fee available to pay people to do the job after subtracting fees for proffit,
consultants and other expenses.
Give this one a try later!
Total Working Fee
A listed device installed in ducts and air transfer openings that is designed to close
automatically on detection of heat, to resist the passage of flame.
Give this one a try later!
Fire Damper
A physical example of a portion of the work, intended to show exactly how a material,
finish, or piece of equipment will look in the completed job.
Give this one a try later!
Sample
In bid documents: set costs for certain portions of work, based on an individual
quantity.