ARE 5.0 PROJECT MANAGEMENT QUESTIONS WITH COMPLETE ANSWERS

Document preview thumbnail
Preview 4 out of 48 pages

ARE 5.0 PROJECT MANAGEMENT QUESTIONS WITH COMPLETE ANSWERS

Content preview

Cost of parking, drives, fences, landscaping, exterior lighting, and irrigation systems.


Give this one a try later!


Site Development Costs




Costs of movable equipment, furnishings, accessories, and window coverings.


Give this one a try later!


Furniture, Fixtures, and Equipment (FF&E)




Includes the standard building code check by the authority having jurisdiction (AHJ)
as well as any other reviews by permitting agencies.

,Give this one a try later!


Agency Review




A building with occupied floors more than 75ft above the lowest level of fire
department vehicle access.


Give this one a try later!


High-Rise Building




The formalized form of mutual understanding about what the architect will do and
what the client will give in return for services rendered.


Give this one a try later!


Contract Documents




Instructs the contractor to proceed with the stated changes in the work, even if the
contractor does not agree with the basis for adjustment in contract sum or contract
time.


Give this one a try later!


Construction Change Directive

,The distance that an occupant would have to travel to get from the most remote point
in the occupied portion of the exit access area, along the natural and unobstructed
path of horizontal and vertical travel, to the entrance to the nearest exit.


Give this one a try later!


Exit Access Travel Distance




Required to ensure that the successful bidder will enter into a contract with the owner.


Give this one a try later!


Bid security




The contractor may decide to speed up the work because the work has fallen behind
the original schedule, the construction company is trying to finish early to collect a
bonus, or they want to move personnel to another job.


Give this one a try later!


Voluntary Acceleration




Process that considers more than just the lowest bid cost, but also factors such as
quality, schedule, and contractor personnel.


Give this one a try later!

, Value-Based Selection (VBS)




The fee available to pay people to do the job after subtracting fees for proffit,
consultants and other expenses.


Give this one a try later!


Total Working Fee




A listed device installed in ducts and air transfer openings that is designed to close
automatically on detection of heat, to resist the passage of flame.


Give this one a try later!


Fire Damper




A physical example of a portion of the work, intended to show exactly how a material,
finish, or piece of equipment will look in the completed job.


Give this one a try later!


Sample




In bid documents: set costs for certain portions of work, based on an individual
quantity.

Document information

Uploaded on
July 17, 2026
Number of pages
48
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CLASSROOMTEST
3.4
(10)
Sold
47
Followers
2
Items
7464
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions