Q1
How soon should the FRA be advised prior to removing a track from excepted status?
Answer: at least 10 days
Q2
CWR is rail length that exceeds feet
Answer: 400
Q3
Does rail installed as CWR change when a joint or plug is installed into the rail at a later time?
Answer: No
Q4
gap
Answer: distance rail moves when cut (in tension)
Q5
pull
Answer: compressed rail pulled into shape
Q6
superelevation
Answer: difference in height between inside and outside of a curve.
Q7
BNSF max elevation is in and min elevation is in
Answer: 5; 3/4