Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

AFSB 152 Simulated Exam with all Correct & 100% Verified Answers |Guaranteed to Pass

Document preview thumbnail
Preview 1 out of 2 pages

AFSB 152 Simulated Exam with all Correct & 100% Verified Answers |Guaranteed to Pass

Content preview

AFSB 152 Simulated Exam with all Correct & 100%
Verified Answers |Guaranteed to Pass

The tender preparation stage of estimating begins after... ✔Correct Answer-the architect and
owner solicit bids, when the contractors begin their estimating processes

To find clarity on payment bond terms, you can... ✔Correct Answer-consult the applicable and
relatively stable case law that does define the terms

A surety needs additional information, such as _____________, to adequately evaluate the
work-backlog risk of granting this bond ✔Correct Answer-the contractor's overall capacity and
financial capacity

The Schedule of __________ is one of the most important schedules used by producers and
underwriters when analyzing a contractor's financial statement ✔Correct Answer-
construction in progress

A potential problem a project owner could encounter when using a design/build contractor is
that government requirements may require a seal on the plans from a professional engineer or
a registered architect, and the design/build contractor may not have a designer on staff (T/F)
✔Correct Answer-T

The design/build contractor charges a separate design fee in addition to the construction
overhead and profit (T/F) ✔Correct Answer-F

You can recognize a small companies tax method by looking at their balance sheet (T/F)
✔Correct Answer-T

Vast majority of small contractors use one method for both tax reporting and financial reporting
✔Correct Answer-F

Bid bonds may not contain specific penal sums or bond penalties (T/F) ✔Correct Answer-T

Through a sharing clause in a construction contract, the ___________ is responsible for cost
overruns, and the _________ are responsible cost underruns ✔Correct Answer-contractor

owner and contractor

An obligation of the principal in a bid bond that is not a manuscript bid bond form is that it
must... ✔Correct Answer-furnish performance and payment bonds with an acceptable surety

Document information

Uploaded on
July 11, 2026
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub
3.6
(14)
Sold
60
Followers
1
Items
12240
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions