Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 82 pages
Exam (elaborations)

AFSB 152 Complete Exam with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Document preview thumbnail
Preview 4 out of 82 pages

AFSB 152 Complete Exam with all Correct & 100% Verified Answers |Actual Complete Exam |Already Graded A+

Content preview

AFSB 152 Complete Exam with all Correct & 100% Verified Answers |
Actual Complete Exam |Already Graded A+
1. Clark Construction was hired as the
Each subcontractor for
general contractor for a large
completing its part of the
residential housing de-velopment. The
project.
general contractor must coor-dinate the
work of

2. The party that directly benefits from
Project owner.
the addi-tional security of knowing
that the contractor has satisfied the
surety's comprehensive pre-qualification
review is the
Commercial, industrial,
3. Hadley Construction operates as a
residential, and public work.
general building contractor. General
building contrac-tors engage in general
building construction, which can be
broken down into

4. Which one of the following describes what hap- The project owner must
pay addi-
pens if there are gaps or omissions in the tional money to the contractor in the
con-struction plans and specifications form of change orders during
when they are offered in the competitive the course of construction.
bid process, and they are discovered
after the construction be-gins?

5. The practice in which a contractor bills the pro- Front-loading.
ject owner more than its cost for items
that occur in the early phases of the
contract and then bills correspondingly
less for items that occur in later phases
is called



, AFSB 152 Complete Exam with all Correct & 100% Verified Answers |
Actual Complete Exam |Already Graded A+
6. An assurance that results from the The significant financial
perfor-mance bond guarantee and assurance, beyond the
benefits the con-struction-project contractor's financial re-sources,
owner is that the contractor will fulfill all
contract terms.






, AFSB 152 Complete Exam with all Correct & 100% Verified Answers |
Actual Complete Exam |Already Graded A+
7. In construction contracts, the Ensures that work is completed
critical path method in a logical sequence and that
the pro-ject is completed
within the time budget
specified in the contract
terms.

8. Ridge Construction constructs locks and dams, General engineering
contractor.
power plants, large bridges, sewage and
water treatment plants, utilities, and
similar projects. Ridge Construction is a

9. To prevent problems when contracting Recruit local help or acquire a
work outside of the contractor's usual joint-venture partner to facilitate
geographic area, the contractor may the project.
need to

10. Payments to the general contractor are usually Each month, after the
architect re-
made 13. The increased
availability of
better financing
11. One can find the responsibilities of all or terms than
parties to a construction project in would otherwise
which one of the following have been re-
documents? ceived in the
absence of a
12. Which one of the following statements
surety bond is a
is cor-rect regarding design/build
benefit to the
contractors?





, AFSB 152 Complete Exam with all Correct & 100% Verified Answers |
Actual Complete Exam |Already Graded A+
ews and certifies the requests for payment.

e construction contract




design/build contractor assumes much greater responsibility than
traditional contractors.

oject owner.

Document information

Uploaded on
July 11, 2026
Number of pages
82
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$19.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub
3.6
(14)
Sold
60
Followers
1
Items
12240
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions