verified to pass 2026
A project monitoring system involves which of the following? - correct answer ✔Deciding what data to
collect
Collecting and analyzing data
Reporting on the data
In a project monitoring system, data collected from ____ activity duration, resource usage, and costs are
compared against ____ activity duration, resource usage, and costs. - correct answer ✔actual;
planned
Which of the following might collect data on a project? - correct answer ✔Project team; project
manager; contractors; Engineers
Project progress reports are designed and communicated in ____. - correct answer ✔written or oral
form
steps for measuring and evaluating project performance - correct answer ✔Setting a baseline plan
Measuring progress and performance
Comparing plan against actual
Taking action
A system for determining what data to collect, analyzing that data; and reporting current progress is
called a project ____ system. - correct answer ✔monitoring
In project monitoring information systems, ___ determine(s) what data to collect. - correct answer
✔the metrics used for project control
, What is the second step in building a project monitoring information system? - correct answer ✔Data
collection and analysis
Control is a process of comparing actual performance against plan to identify deviations, evaluate
possible alternative courses of actions, and take appropriate corrective action. - correct answer ✔true
In the project control process, the ____ provides the project control process with the elements for
measuring performance. - correct answer ✔baseline
Time and budgets are _________ measures of performance that readily fit into the integrated
information system. - correct answer ✔quantitative
The third step in the project control process of the measurement and evaluation of project performance
is ___. - correct answer ✔comparing planned against actual performance
The fourth step in the project control process of the measurement and evaluation of project
performance is to ____________. - correct answer ✔take necessary corrective actions
A major goal of progress reporting is to catch any negative variances from plan as early as possible to
determine if corrective action is necessary. The project network schedule, derived from the ______,
serves as the baseline to compare against actual performance. - correct answer ✔Work breakdown
structure (WBS)
How far into the future does a tracking Gantt chart go at the start of the project? - correct answer ✔It
depends
Measuring progress and performance is the _______ step in creating a project control system for
measuring and evaluating project performance. - correct answer ✔second