1.
The primary role of a Permit Technician is to:
A. Process and route permit applications for review and issuance
B. Inspect buildings in the field
C. Design structural systems
D. Install building systems
Answer: A
Permit technicians handle intake and processing of permits.
2.
Permit technicians primarily work in:
A. Building department offices
B. Construction sites
C. Fire suppression teams
D. Engineering labs
Answer: A
Administrative function.
3.
A building permit is required to:
A. Ensure code compliance before construction begins
B. Increase project speed
C. Reduce inspections
D. Avoid documentation
Answer: A
Legal approval process.
4.
,The Florida Building Code is used to:
A. Regulate construction standards
B. Control property sales
C. Manage landscaping
D. Set pricing for materials
Answer: A
Construction regulation.
5.
Permit intake includes:
A. Reviewing application completeness
B. Installing systems
C. Inspecting structures
D. Approving field work
Answer: A
Administrative screening.
6.
A permit application must include:
A. Required documents and plans
B. Contractor lunch schedule
C. Material delivery dates
D. Paint colors
Answer: A
Submission requirement.
7.
Routing a permit means:
A. Sending documents to appropriate reviewers
B. Approving construction
C. Rejecting all applications
D. Issuing inspections
Answer: A
Workflow distribution.
, 8.
Plan review is performed by:
A. Qualified code officials and reviewers
B. Contractors
C. Property owners
D. Suppliers
Answer: A
Technical review.
9.
Permit technicians verify:
A. Application completeness
B. Structural design
C. Electrical wiring
D. HVAC sizing
Answer: A
Administrative check.
10.
A permit cannot be issued without:
A. Required approvals and compliance
B. Contractor preference
C. Owner request only
D. Verbal approval
Answer: A
Legal requirement.
11.
A “set of plans” refers to:
A. Drawings submitted for review
B. Furniture layout
C. Landscaping design