Al0l: Standard Form of Agreement Between Owner and Contractor-
Stipulated Sum
A133: Owner-Construction Manager as Constructor Agreement
A195: Owner-Contractor Agreement for Integrated Project Delivery
A201: General Conditions of the Contract for Construction
A295: General Conditions of the Contract for Integrated Project Delivery
A70l: Instructions to Bidders
Program Management (PgM)
,Give this one a try later!
The science and practice of managing large private and public projects.
Assessing the Needs of the Project
Give this one a try later!
Selecting the right delivery method.
Align contract requirements to the project.
Align your own services with the needs of the project.
Identify other parties in the project - based on delivery method (design
build vs design bid build).
Design bid build most prevalent, Const Mgt is second most prevalent.
Uses of AIA Contract Documents (3)
Give this one a try later!
Negotiate the Terms of Your Relationship
Deliver Elements of Agreements
Manage Risks
BIM
Give this one a try later!
, Building Information Modeling
Exhibit-1 to the B101
Give this one a try later!
An initial information exhibit. Used as a checklist. Forms the basis of
Architects / parties understanding of the agreement.
This contract is a standard agreement between the owner and architect. It
outlines the responsibilities for each party in order to help mitigate risk.
What types of Charattes are QM actions in Schematic Design?
Give this one a try later!
Kickoff Charattes, Sustainability Charettes, and Remedial Charettes.
The following is included in an Architect's minimum construction contract
administration services.
Give this one a try later!
, Reporting to the building official
Approving submittals
Reporting to the owner
Shop drawing review
Periodic site visits
Q. A team is assembled to convert a space into a very small veterinary office. The
project is not complex, and the architects estimated that the project fee will be
approximately $30,000. The project requires coordination among the few team
members. Which is the best way to coordinate and manage the project? Select the
best answer.
Give this one a try later!
A. Milestone chart
B. CPM schedule
C. Gantt Chart
D. Bar Chart
Solution: The correct answer is A.
The milestone chart is used for short-duration projects with relatively few
tasks to track and fees under $35,000. It is tempting to use this method for
larger projects, but this would simply not provide the detail needed to
manage the project. A CMP schedule could be another alternative, but in
the case of such a small scope, it is not necessary. The Gantt Chart is the
same as the bar chart.
Reference: Wiley and Sons. (2013). The architect's handbook of professional
practice (15th ed.).
Consequential Damages
Give this one a try later!
Give this one a try later!
Al0l: Standard Form of Agreement Between Owner and Contractor-
Stipulated Sum
A133: Owner-Construction Manager as Constructor Agreement
A195: Owner-Contractor Agreement for Integrated Project Delivery
A201: General Conditions of the Contract for Construction
A295: General Conditions of the Contract for Integrated Project Delivery
A70l: Instructions to Bidders
Program Management (PgM)
,Give this one a try later!
The science and practice of managing large private and public projects.
Assessing the Needs of the Project
Give this one a try later!
Selecting the right delivery method.
Align contract requirements to the project.
Align your own services with the needs of the project.
Identify other parties in the project - based on delivery method (design
build vs design bid build).
Design bid build most prevalent, Const Mgt is second most prevalent.
Uses of AIA Contract Documents (3)
Give this one a try later!
Negotiate the Terms of Your Relationship
Deliver Elements of Agreements
Manage Risks
BIM
Give this one a try later!
, Building Information Modeling
Exhibit-1 to the B101
Give this one a try later!
An initial information exhibit. Used as a checklist. Forms the basis of
Architects / parties understanding of the agreement.
This contract is a standard agreement between the owner and architect. It
outlines the responsibilities for each party in order to help mitigate risk.
What types of Charattes are QM actions in Schematic Design?
Give this one a try later!
Kickoff Charattes, Sustainability Charettes, and Remedial Charettes.
The following is included in an Architect's minimum construction contract
administration services.
Give this one a try later!
, Reporting to the building official
Approving submittals
Reporting to the owner
Shop drawing review
Periodic site visits
Q. A team is assembled to convert a space into a very small veterinary office. The
project is not complex, and the architects estimated that the project fee will be
approximately $30,000. The project requires coordination among the few team
members. Which is the best way to coordinate and manage the project? Select the
best answer.
Give this one a try later!
A. Milestone chart
B. CPM schedule
C. Gantt Chart
D. Bar Chart
Solution: The correct answer is A.
The milestone chart is used for short-duration projects with relatively few
tasks to track and fees under $35,000. It is tempting to use this method for
larger projects, but this would simply not provide the detail needed to
manage the project. A CMP schedule could be another alternative, but in
the case of such a small scope, it is not necessary. The Gantt Chart is the
same as the bar chart.
Reference: Wiley and Sons. (2013). The architect's handbook of professional
practice (15th ed.).