What determines the size of the pipe used in a sprinkler system?
A. How tall the grass is
B. How far the run is from the water source
C. How many circuit there are
D. How many GPM is needed to flow through it
D. How many GPM is needed to flow through it
Matching Water Flow and Pressure with Pipe Size To select and specify the most suitable pipe,
the irrigation system designer must know the amount of water demanded by the sprinkler heads
that are downstream from each section of pipe.
,What best describes foliage on trees?
A. the leaves, branches and the trunk
B. the leaves
C. the leaves and branches
D. the flowers on the tree
B. the leaves
Which of the following species include both evergreen and deciduous varieties?
A. cypress
B. maple
C. oak
D. pine
C. oak
,What should be provided as a cover for the drain tile before installing the pond liner where a
subdrain is used?
A. 4 inches of pea gravel
B. a pool grate
C. screen with a 1/4 inch mesh
D. 8 inches of medium sized rock
A. 4 inches of pea gravel
The use of mulch on new plants does all except?
A. Control Temperature fluctuations
B. Stops insects
C. Discourages weed growth
D. Aid in water retention
, B. Stops insects
If a contractor is in willful violation of Arizona Blue Stake , what is the maximum fine?
A. $5000.00
B. $500.00
C. $250.00
D. $300.00
A. $5000.00
Arizona law (A.R.S. 40-360.21-32) says underground utilities must be marked before any type of
excavation by anyone, including professional excavators, homeowners and anyone else whose
work disrupts the subsurface of the earth. This law is enforced by the Arizona Corporation
Commission (ACC) who can issue citations for civil penalties of up to $5,000 per violation.
Which finish is best used when subject to regular dampness?
A. Putty finish
B. Sand finish