1. What is the primary purpose of a road construction inspector? T
v v v v v v v v v v v
o ensure construction meets plans, specifications, and safety st
v v v v v v v v
andards
Inspectors verify work quality, adherence to design, and safety c
v v v v v v v v v
ompliance.
2. Which of the following materials is commonly used for base layers in
v v v v v v v v v v v
vroad construction? v
Crushed stone or gravel v v v
Base layers require strong, stable materials to support asphalt or c
v v v v v v v v v v
oncrete surfaces. v
3. The term “subgrade” refers to:
v v v v
The native soil prepared to support the pavement structure Subgr
v v v v v v v v v
ade provides the foundational support for the road layers above it.
v v v v v v v v v v
4. When inspecting asphalt paving, which test checks compaction?
v v v v v v v
Nuclear density test v v
Density tests ensure asphalt is properly compacted for longevity and
v v v v v v v v v v
performance.
5. What is the purpose of a prime coat?
v v v v v v v
To promote bonding between the subbase and asphalt surface
v v v v v v v v
, Prime coats improve adhesion and seal the base to prevent water infi
v v v v v v v v v v v
ltration.
6. Which piece of equipment is used to grade and level road s
v v v v v v v v v v v
urfaces?
Motor grader v
Graders are designed to create smooth, even surfaces before paving.
v v v v v v v v v
7. When inspecting concrete pavements, what does “curing” refer t
v v v v v v v v
o?
Maintaining proper moisture and temperature after placement
v v v v v v
Curing ensures concrete develops strength and durability properly.
v v v v v v v
8. What is the standard slope for a typical two-lane road crown?
v v v v v v v v v v
1/4 inch per foot (2%)
v v v v
Proper crown ensures water drains from the pavement surface.
v v v v v v v v
9. The purpose of a geotextile fabric in road construction is to:
v v v v v v v v v v
Separate, filter, reinforce, or drain soil layers
v v v v v v
Geotextiles improve stability and prevent mixing of materials.
v v v v v v v
10. Which test measures the strength of compacted subgrade?
v v v v v v v
California Bearing Ratio (CBR) test
v v v v
CBR assesses the load-bearing capacity of subgrade soils.
v v v v v v v
11. What is the typical maximum lift thickness for asphalt layers?
v v v v v v v v v
4 inches (100 mm)
v v v
Thicker lifts may not compact uniformly, risking pavement failure.
v v v v v v v v
12. A slump test is performed to check:
v v v v v v
Workability of fresh concrete v v v
, Slump indicates if concrete can be properly placed and consolidated.
v v v v v v v v v
13. When performing a field density test on soil, which method
v v v v v v v v v v
may be used?
v v
Sand cone testv v
Sand cone tests determine in-place soil density accurately.
v v v v v v v
14. What does QA/QC stand for in road construction?
v v v v v v v
Quality Assurance / Quality Control
v v v v
QA ensures processes meet standards; QC checks the final product.
v v v v v v v v v
15. What type of survey is typically conducted before road c
v v v v v v v v v
onstruction begins? v
Topographic survey v
Topographic surveys map terrain to guide design and construction.
v v v v v v v v
16. Why is drainage important in road construction?
v v v v v v
To prevent water damage and pavement failure
v v v v v v
Proper drainage prolongs road life and prevents structural damage.
v v v v v v v v
17. When inspecting aggregate materials, which property is
v v v v v v v
most critical?v
Gradation and cleanliness v v
Correct particle size and low fines ensure proper compaction and stre
v v v v v v v v v v
ngth.
18. Which document defines the specifications for materials and
v v v v v v v v
work?
Project plans and specifications
v v v
These documents set standards the contractor must meet.
v v v v v v v