Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 52 pages
Exam (elaborations)

Final Estimates Level 2 Exam Questions And Answers Verified 100% Correct

Document preview thumbnail
Preview 4 out of 52 pages

Final Estimates Level 2 Exam Questions And Answers Verified 100% Correct

Content preview

,
,FINAL ESTIMATES LEVEL 2 TEST QUESTIONS AND ANSWERS 2025.2026 GUARANTEED PASS
GRADED A+




On multi FIN project numbers under one contract, the Asphalt is reported on the certification,
by the CONTRACTOR, under what Project FIN Number? - ANSWER=The Contractor shows the
Asphalt on the lead FIN project number



A roadway is being constructed and has a Subsoil Excavation Quantity of 835 CY, a Regular
Excavation Quantity of 250 CY and an embankment Quantity of 1040 CY. Based upon this
information, the Final Quantity to be paid for embankment will be? - ANSWER=1875 CY



Which Document is used to authorize payment from original contingency Amount? -
ANSWER=Work Order




Friction Course (FC-12.5) Straight edge Deficiency: A straightedge deficiency was left in place at
no pay. Calculate the equivalent tonnage at no pay. ( pay to appropriate accuracy) Gmm=
2.417, thickness =1.5 inches, road width =12 feet, length of deficiency = 5 ft. (this occurred 25
feet from the bridge deck) - ANSWER=8.4 Tons




Overruns or Underruns must be explained when? - ANSWER=A pay item overruns or underruns
$10,000 or more.



Prices are adjusted on each progress estimate to reflect increases or decreases in the price of
fuel for contracts with original Contract Time: - ANSWER=In excess of 120 calendar days.

, Which of the following is an authorized way to modify the contract, once it has been executed?
- ANSWER=Work Orders and Supplimental Agreements



Of the Contract Documents listed below which one would govern? - ANSWER=Special Provisions




Why is it important to run a progress estimate soon after Final Acceptance? - ANSWER=So the
estimate can be paid through EED quickly to prevent interest.




On Financial Project No.000101-1-52-01, which is a conventional project, the notice to proceed
is dated December 1, 2015 and the contract time is to start 16 days after the Notice to Proceed
per the contract. The Contractor begins work on December 18, 2015 and the project is Final
Accepted on December 31, 2015. There are no added weather or other reasons. What is the 1st
chargeable day and how many total days should be recorded in the Contract Time File? -
ANSWER=12/17/2015 with 15 chargeable days.




On Lump Sum Contracts, upon Final Acceptance, the Project Administrator will send? -
ANSWER=The Offer of Final Payment




Field Records for multiple jobs, same contract, should be kept? - ANSWER=In seperate Field
Books & In seperate files within Project Solve and EDMS



On Lump Sum Project, A Superpave Asphalt Course item requires a Composite Pay Factor (CPF)
adjustment. What is the total dollar adjustment amount?

Lot 1 with 2000 Tons and a CPF of 0.99

Document information

Uploaded on
July 3, 2026
Number of pages
52
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheExamMaestro
3.6
(18)
Sold
149
Followers
5
Items
3668
Last sold
19 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions