Comprehensive Resource To Help You Ace 2026-2027 Exams
Includes Frequently Tested Questions With ELABORATED
100% Correct COMPLETE SOLUTIONS
Guaranteed Pass First Attempt!! Current Update!!
1. All septic tank contractors must be certified by the
__________________________________ - Correct Answer: Georgia
Department of Human Resources
2. The soil serves to clean wastewater by filtering out particulates, that is
______(1)________, plus removing ______(2)________ & ______(3)_______. -
Correct Answer: 1) solid material
2) bacteria
3) viruses
3. A properly designed and installed system will adequately treat and
dispose of watstewater, and will ensure the protection of our __________
resources for future generations. - Correct Answer: drinking water
4. No person may begin the physical development of a lot or structure - where an
on-site sewage management system will be used without first obtaining a
construction permit from the _____(1)______ section of the county health
department. This process begins with the applications for a permit by the
,____(2)_____ or ___(3)_____ of the property - Correct Answer: 1)
Environmental Health
2) owner
3) developer
5. The application for permit shall include:
- The name and address of the property owner
- Location of property
- Type of ____(1)_____ to be served
- Type of ___(2)____ supply
- Number of ___(3)___ and/or estimated gallons of sewage flow per day
- Soil information - Correct Answer: 1) facility
2) water
3) bedrooms
6. Any facility having occupancy for _________ or more must provide an approved
on-site sewage management system. - Correct Answer: two hours
7. _____________ are an acceptable means of sewage disposal for a facility not
served by water under pressure. - Correct Answer: Pit Privies
8. Any repairs, replacement or additions to an existing system must be ______ &
_______. - Correct Answer: permitted, inspected
,9. After having completed the application process, a _________ is conducted. -
Correct Answer: site inspection
10. The inspector considers information supplied on the application;
- including house location
- ___(1)___ characteristics
- ___(2)___ rates
- ___(3)___ conditions
- rock conditions
- lay of the land
- bodies of water, streams and other factors which affect the suitability of the lot. -
Correct Answer: 1) soil
2) absorption
3) ground water
11. The approved permit will include the ________ requirements for the septic
system. - Correct Answer: minimum
12. Approved minimum requirements include:
- __(1)__ size
- __(2)__ length
- __(3)__ and __(4)__
- and any special conditions for the installation - Correct Answer: 1) tank
2) trench
, 3) depth
4) width
13. Absorption field lengths are generally determined by the ___(1)___ in the
home or the estimated ___(2)___ water usage - Correct Answer: 1) number of
bedrooms
2) gallon per day
14. Absorption field depths are determined by the ______ on the property. -
Correct Answer: soil conditions
15. If any conditions of the permit cannot be met, the ____________ must be
contacted prior to installation of the system. - Correct Answer: health
department
16. When planning the layout of the system, these should be considered.
- Location and elevation of the ___(1)___
- ___(2)___ of the land
- ___(3)___ line locations
- Location of __(4)__, springs, ___(5)___, streams, water supply lines, trash pits,
etc that may adversely affect your installation
- ___(6)___ for future absorption field. - Correct Answer: 1) plumbing stub out
2) slope
3) property
4) wells