Answers Latest 2026/2027 | Actual Exam 100% Correct |
Graded A+.
The Virginia Stormwater Management Program is authorized by the
______ and administered through the ______ - CORRECT
ANSWER-Virginia Stormwater Management Act, Virginia
Stormwater Management Program Regulation
VPDES Permit/Construction GP authorizes discharge of stormwater
from construction activities that are - CORRECT ANSWER-greater
than or equal to an acre
The Stormwater Management Act requires the following individuals
to obtain and maintain a certificate of competency - CORRECT
ANSWER-staff of a stormwater program, anyone contracted by a
VSMP authority, standard and specification holders
SWM plan must be approved by ___ before land disturbance -
CORRECT ANSWER-VSMP program authority
,The water quality criteria sets a site-based load limit of ____ of total
phosphorus for new development - CORRECT ANSWER-0.41
lbs/acre/year
The Stormwater Management Act requires the State Water Control
Board to - CORRECT ANSWER-permit, regulate, and control
stormwater runoff
DEQ has ___ days to complete review of real or potential
interjurisdictional impacts upon request -
CORRECT ANSWER-90
The phosphorus load limit uses the - CORRECT ANSWER-10%
impervious cover
Part II B and II C water quantity criteria addresses - CORRECT
ANSWER-channel protection and flood protection
, Thank you for Purchasing this exam
Study Guide. We provide high-quality
academic materials to help students
excel in exams. Our other Services
include but not limited to: academic
research, University & College
assignments writing, essay writing,
Online Classes, and research projects.
Our services are reliable, affordable,
and plagiarism-free. All the Best in
your Exam. For more information;
Contact us at:
or
0R +254
741484450