Module 7 Study Guide 2026–2027 | Complete Questions &
\
Answers
1. Planning: What stage: v v
Gather available data v v
Prior to occupying TTC zone
v v v v
Considertheneedsofallusers
v v v v v v
Coordinate between adjacent or overlapping projects v v v v v
2. Design: Whatstage: v v
Selectbesttraflccontrolalternative
v v v v
basedon:safety,mobility,cost,constructability
v v v v v
3. TrafficFactors,characteristics,andspeed. v v v v
Traffic controls, urban features, and traffic generators: WhatFactorsettectthedesignof
v v v v v v v v v v v v
aTTCplan v v
4. Long-term stationary v
Intermediate-term stationary
v v
short-term stationary
v v
short-duration
mobile: What are the MUTCD categories of Work Duration?
v v v v v v v v
5. Occupieslocationmorethan3days v v v v v
largerchannelizingdevicesandpostmountedsigns v v v v v v
conflictingroadwaymarkingsremovedandreplacedwithtemporarymark-ings v v v v v v v v
cover or remove conflicting signage: Long-termstationary(MUTCDworkdurationcategory)
v v v v v v v v v v
6. Morethan1day,lessthan3days v v v v v v v
Nightime work of more than 1 hour: Intermediate-stationary (MUTCD work duration category)
v v v v v v v v v v v
7. Daytimework1to12hours v v v v v
cones andportablesigns:Short-termstationary(MUTCDworkdurationcategory)
v v v v v v v v v
8. workthatmovesintermittentlyorcontinuously v v v v v
May use truck-mounted impact attenuators: Mobile(MUTCDworkdurationcategory)
v v v v v v v v v
9. Constructability: Nature of the work v v v v
access requirements v
drainage issues, drainage during construction construction
v v v v v
equipment
v
sizeofworkspacev v v
1/ 3v v