What are the initial requirements for a shipboard GFE and when may requirements be
waived? - ANS-REQS:
- CPO+ and completed GFE training course
- 40 hrs OTJ under GFE supervision
- CO written certification
Waiver:
- 40 hrs OTJ if graduated from GFE training within 36 months and unit does not have
qualified GFE onboard
In what should all GFEP be trained? - ANS-- Emergency response procedures
- GFE procedures and techniques
- Basic Life Support (BLS) and CPR IAW Red Cross or MTN
When are GFEP recertified, and what are the recertification requirements? -
ANS-Annually
Requirements:
- Demonstration of capability
- Refresher training
How are all hands and emergency teams trained, and what training records are
maintained? - ANS-- GFE indoctrination training and annually thereafter IAW 074
- Personnel trained in confined space rescue
- Toxic Gas drill outlined in MOB-D
Describe the purpose of each of the following GFE items: GFE INST. - ANS--
Supplement 074 to provide ship-specific GFE program requirements and procedures
- Establish precautionary measures and delineates responsibilities and inspection
requirements involving activities that may produce hazardous conditions
Describe the purpose of each of the following GFE items: GFE notebook. - ANS--
Contains ship-specific GFE program procedures and used to organize records
- Provide ready reference for shipboard gas free personnel when 074 not readily
available or ship-specific details not included
Describe the purpose of each of the following GFE items: Toxic Gas Bill. -
ANS-Specifies procedures and assigns duties and responsibilities to control and
minimize effects of toxic gas within the unit
, When are the following certificates required? Closed Compartment Opening Request -
ANS-- Support of opening closed space
- Submitted by requesting division and approved by GFE
- IDLH requires CO approval
- Request is for opening only, entry authorized using gas free cert
- Can be used to request other services like ventilation or planning for cold work
When are the following certificates required? Hot work certificate - ANS-- Any operation
producing temperatures in excess of 400 degrees
- Categorized into Class I (high energy sparks or slag that can be transferred through
deck, overhead, bulkhead, etc) or Class II (minimal energy sparks generally localized to
immediate work area)
- Typically approved by FM unless space requires gas free
When are the following certificates required? Cold work certificate - ANS-- Inspections,
cleaning, or minor repairs where no hot work will be conducted (space inspections,
spray painting, cleaning, strippers, thinners, paints, or cleaners that produce vapors)
When are the following certificates required? Navy Gas Free Certification and Test Log
(gas free chit) - ANS-- Record initial certification, gas free-related hot work, test results,
and recertification
- Issued and maintained for each confined space that is inspected or tested
Before entry into, or work in or on, confined spaces, what eight factors should be
evaluated to identify potential hazards and determine appropriate test requirements? -
ANS-- Present or previous contents of space
- Location and configuration
- Type of operation to be conducted within space
- Fixed equipment within space and potential hazards
- Contents or nature of boundary spaces
- Environmental conditions
- Additional hazards that can be created by work interruptions
in what ways can toxic hazards be created? - ANS-- Byproducts of heat / combustion:
CO, CO2, H2S
- Present until heated or burnt in fire: chill water insulation produces AC, PVC produces
HCl, welding produces NO2, Halon produces HF, Petroleum produces hydrocarbon gas