QM 6655 Quiz 3 | Questions and Answers with
Complete Solution | Latest Update 2026


Question 1
pts
To save time, you use information from a similar project to help you estimate your activity
durations. This is an example of which tool or technique?


A. Bottom-up estimating


Correct!


B. Analogous estimating



C. Parametric estimating



D. Three-point estimating

B is correct. Analogous estimating involves using information from similar projects (i.e., an
analogy) to estimate elements of your project. This is generally less costly and time consuming
than other techniques.
A, C, and D are incorrect. A is incorrect because bottom-up estimating breaks down work
packages and activities into the smallest possible piece of work, then adds up the time and cost
for each to get a total project cost or duration. C is incorrect because parametric estimating is a
process that multiplies known quantities by known financial rates or metrics. D is incorrect
because three-point estimating uses the optimistic, realistic, and pessimistic estimates to
calculate a weighted average.


Question 2
pts

, What is the authorized time-phased budget at completion used to measure, monitor, and
control overall cost performance on the project more commonly known as?


A. Approved project budget


Correct!


B. Cost baseline


C. Activity cost estimates


D. Total funding requirements

B is correct. The cost baseline is the aggregation of the Estimate Cost and Determine Budget
processes.
A, C, and D are incorrect. A is incorrect because the approved project budget may sound like a
correct term, but it is not one that is in the PMBOK Guide. C is incorrect because activity cost
estimates are an input into the Determine Budget process, and they become the cost baseline
once amalgamated with elements of the schedule. D is incorrect because total funding
requirements may sound like a correct term, but it is not one that is in the PMBOK Guide.


Question 3
pts
You assign one of your junior staff to track the actual start and finish of activities and milestones
to ensure they are being performed against the planned timeline. Which of the following
processes is most consistent with these activities?


A. Control Scope


Correct!


B. Control Schedule

Document information

Uploaded on
June 15, 2026
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudySet
3.9
(640)
Sold
2759
Followers
1748
Items
19862
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions