1. What is the primary responsibility of a general building
contractor?
A. Design buildings only
B. Manufacture construction materials
C. Coordinate and supervise construction projects
D. Inspect electrical systems only
Answer: C. Coordinate and supervise construction projects
General contractors manage the overall construction process,
including subcontractors, scheduling, and compliance.
2. A building permit is generally required before:
A. Ordering materials
B. Hiring workers
,C. Beginning construction work
D. Advertising a project
Answer: C. Beginning construction work
Permits ensure that proposed work complies with applicable
building codes and regulations.
3. Which document defines the scope of work?
A. Invoice
B. Change order
C. Inspection report
D. Construction contract
Answer: D. Construction contract
The contract outlines project requirements, responsibilities,
costs, and scope.
4. Concrete gains most of its design strength in
approximately:
A. 3 days
B. 7 days
C. 14 days
D. 28 days
Answer: D. 28 days
Concrete is generally rated based on its compressive strength
after 28 days of curing.
,5. The purpose of footings is to:
A. Support roofing
B. Transfer loads to the soil
C. Hold insulation
D. Support windows
Answer: B. Transfer loads to the soil
Footings distribute building loads safely to the ground.
6. Which type of drawing shows the arrangement of rooms?
A. Elevation
B. Detail
C. Section
D. Floor plan
Answer: D. Floor plan
A floor plan provides a top-down view of spaces and
dimensions.
7. OSHA regulations primarily focus on:
A. Tax compliance
B. Environmental permits
C. Workplace safety
D. Equipment financing
Answer: C. Workplace safety
OSHA establishes standards to protect workers from hazards.
, 8. A change order is used to:
A. Hire employees
B. Close permits
C. Modify the original contract
D. Obtain insurance
Answer: C. Modify the original contract
Changes in scope, cost, or schedule require documented
approval.
9. What is the standard unit used for concrete strength?
A. PSI
B. Pounds per square inch (psi)
C. Kips
D. Inches
Answer: B. Pounds per square inch (psi)
Concrete compressive strength is commonly expressed in psi.
10. The critical path in scheduling refers to:
A. The safest route to a jobsite
B. Material delivery routes
C. Activities determining project duration
D. Employee training schedules
Answer: C. Activities determining project duration
Delays in critical path activities delay project completion.
Contractor Exam Practice
Questions And Correct
Answers (Verified Answers)
Plus Rationales 2025/2026
Q&A | Instant Download Pdf
1. What is the primary responsibility of a general building
contractor?
A. Design buildings only
B. Manufacture construction materials
C. Coordinate and supervise construction projects
D. Inspect electrical systems only
Answer: C. Coordinate and supervise construction projects
General contractors manage the overall construction process,
including subcontractors, scheduling, and compliance.
2. A building permit is generally required before:
A. Ordering materials
B. Hiring workers
,C. Beginning construction work
D. Advertising a project
Answer: C. Beginning construction work
Permits ensure that proposed work complies with applicable
building codes and regulations.
3. Which document defines the scope of work?
A. Invoice
B. Change order
C. Inspection report
D. Construction contract
Answer: D. Construction contract
The contract outlines project requirements, responsibilities,
costs, and scope.
4. Concrete gains most of its design strength in
approximately:
A. 3 days
B. 7 days
C. 14 days
D. 28 days
Answer: D. 28 days
Concrete is generally rated based on its compressive strength
after 28 days of curing.
,5. The purpose of footings is to:
A. Support roofing
B. Transfer loads to the soil
C. Hold insulation
D. Support windows
Answer: B. Transfer loads to the soil
Footings distribute building loads safely to the ground.
6. Which type of drawing shows the arrangement of rooms?
A. Elevation
B. Detail
C. Section
D. Floor plan
Answer: D. Floor plan
A floor plan provides a top-down view of spaces and
dimensions.
7. OSHA regulations primarily focus on:
A. Tax compliance
B. Environmental permits
C. Workplace safety
D. Equipment financing
Answer: C. Workplace safety
OSHA establishes standards to protect workers from hazards.
, 8. A change order is used to:
A. Hire employees
B. Close permits
C. Modify the original contract
D. Obtain insurance
Answer: C. Modify the original contract
Changes in scope, cost, or schedule require documented
approval.
9. What is the standard unit used for concrete strength?
A. PSI
B. Pounds per square inch (psi)
C. Kips
D. Inches
Answer: B. Pounds per square inch (psi)
Concrete compressive strength is commonly expressed in psi.
10. The critical path in scheduling refers to:
A. The safest route to a jobsite
B. Material delivery routes
C. Activities determining project duration
D. Employee training schedules
Answer: C. Activities determining project duration
Delays in critical path activities delay project completion.