⩥ 53. For concrete slabs, the minimum curing time at temperature above
40 ˚ F should be at least_____..
Answer:
⩥ 54. Deformations on rebar_____..
Answer:
⩥ 55. Concrete mixers with _______________ or larger loading skips
shall be equipped with mechanical devices to clear the skip of materials
and guardrails on each side of the skip..
Answer:
⩥ 56. Utility-grade studs in a bearing partition wall supporting two
stories above and a ceiling and a roof shall be spaced not more
than_______ inches on center..
Answer:
⩥ 57. Glass block panels shall be provided with expansion joints
along____ at all structural supports..
, Answer:
⩥ 58. Restraints placed at 900 to the Top Chord members
prevent______..
Answer:
⩥ 59. The minimum staple length for fastening ½" gypsum panels is
_______ inches..
Answer:
⩥ 60. Foundation walls of rough or random rubble stone shall not be less
than _____ inches thick.
Answer:
⩥ 61. When masonry blocks are stacked higher than 6 feet, _______..
Answer:
⩥ 62. Which of the following is a characteristic of structural lightweight
aggregate concrete..
Answer:
⩥ 63. When using screws to install gypsum panels over existing solid
wall surfaces, the screws must penetrate the underlying wood framing
not less than ____ inch..