Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

LADOTD Highway Plan Reading I Exam Questions With Correct Answers

Rating
-
Sold
-
Pages
23
Grade
A+
Uploaded on
07-05-2026
Written in
2025/2026

LADOTD Highway Plan Reading I Exam Questions With Correct Answers

Institution
LADOTD
Course
LADOTD

Content preview

LADOTD Highway Plan Reading I Exam
Questions With Correct Answers

1-1a: The CONTRACT covering the construction project is a(n) _____ between
| | | | | | | | | | |


LADOTD and the contractor. - CORRECT ANSWER✔✔-Written agreement
| | | | | | |




1-1b: Which document asks the contractor to submit a cost bid for a project? -
| | | | | | | | | | | | | | |


CORRECT ANSWER✔✔-Invitation to Bid
| | |




1-1c: Contractors base their bid on the materials and labor necessary to construct
| | | | | | | | | | | |


the highway project. Which document tells the contractor WHAT to construct and
| | | | | | | | | | | |


WHERE to construct it? - CORRECT ANSWER✔✔-Plans
| | | | | | |




1-1d: List the three categories regarding specs for a project - CORRECT
| | | | | | | | | | | |


ANSWER✔✔-Standard, Supplemental, Special | |




1-1e: After the contractor completes an estimate, they fill out and submit a _____
| | | | | | | | | | | | |


- CORRECT ANSWER✔✔-Proposal
| | |




1-1f: The Dept issues a(n) _____ allowing the contractor to start a project. -
| | | | | | | | | | | | | |


CORRECT ANSWER✔✔-Notice to Proceed
| | |




1-1g: What can change the contract after the start of the project? - CORRECT
| | | | | | | | | | | | | |


ANSWER✔✔-Plan Changes/Special Agreements | |

,1-1h: Which documents are the most referenced when used to inspect; what,
| | | | | | | | | | | |


where, and how the contractor builds? - CORRECT ANSWER✔✔-Plans
| | | | | | | |




1-1i: Record the name of the document the project engineer prepares when a
| | | | | | | | | | | | |


change in plans is required. - CORRECT ANSWER✔✔-Change Orders
| | | | | | | |




Occasionally, a contractor must preform extra work, to complete the project.
| | | | | | | | | | |


Prior to the contractor performing the work, the Chief Engineer signs a _______. -
| | | | | | | | | | | | |


CORRECT ANSWER✔✔-Change order
| | |




1-2a: Which specs apply to only a specific project under contract? - CORRECT
| | | | | | | | | | | | |


ANSWER✔✔-Special Provisions |




1-2b: What specs apply to all projects? - CORRECT ANSWER✔✔-Standard Specs
| | | | | | | | | |




1-2c: Special directions applicable to specific projects are _____. - CORRECT
| | | | | | | | | | |


ANSWER✔✔-Special Specs |




1-2d: A revision or amendment to the Standard Specs is a ______. - CORRECT
| | | | | | | | | | | | | |


ANSWER✔✔-Supplemental Specs |




1-3a (1-4): List the PROCEDURAL ORDER TO FOLLOW with regard to the
| | | | | | | | | | | |


clarification of possible contract discrepancies. - CORRECT ANSWER✔✔-1.
| | | | | | | |


Special, 2. Plans, 3. Supplemental, 4.Standard
| | | | |

, 1-4a: To read a set of plans it is important to accurately _____ and understand
| | | | | | | | | | | | | | |


what is meant by each drawing an notation. - CORRECT ANSWER✔✔-Interpret
| | | | | | | | | |




1-4b: The plans indicate ____ to build and _____ to build a project. - CORRECT
| | | | | | | | | | | | | | |


ANSWER✔✔-What and Where | |




1-4c: Sheets within a set of plans _____ to each other. Info pertaining to a
| | | | | | | | | | | | | | |


particular feature of the project often appears on more than one sheet. -
| | | | | | | | | | | | |


CORRECT ANSWER✔✔-Relate |




1-4d:It is very important to keep a plan set _____ and in _____. - CORRECT
| | | | | | | | | | | | | | |


ANSWER✔✔-Clean and in order | | |




2-2a. There are two types of project numbers used to identify a project. (DRAIN
| | | | | | | | | | | | | |


CANAL BRIDGES ON US HWY 90) - CORRECT ANSWER✔✔-Federal, State
| | | | | | | | |




2-4a. List the three things on the Title Sheet that identify a project. (DRAIN
| | | | | | | | | | | | | |


CANAL BRIDGES ON US HWY 90) - CORRECT ANSWER✔✔-State Project #, Federal
| | | | | | | | | | | |


Project #, Project Name
| | |




2-6a. List three places on the Title Sheet that indicate the State Project Number.
| | | | | | | | | | | | | |


(DRAIN CANAL BRIDGES ON US HWY 90) - CORRECT ANSWER✔✔-Project Caption,
| | | | | | | | | |


|Title Block, Layout Map
| | |




2-8. Prefix Acronyms such as STP, I, BR, etc are ______. - CORRECT ANSWER✔✔-
| | | | | | | | | | | | |


Federal-funding categories |

Written for

Institution
LADOTD
Course
LADOTD

Document information

Uploaded on
May 7, 2026
Number of pages
23
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip West Virginia University
View profile
Follow You need to be logged in order to follow users or courses
Sold
271
Member since
2 year
Number of followers
6
Documents
25387
Last sold
1 day ago
WELCOME TO LECTPHILIP, A PLACE WHERE WE UNLOCK YOUR ACADEMIC OPPORTUNITIES

On this page, you find all documents, package deals and flashcards offered by seller lectphilip

4.0

42 reviews

5
21
4
8
3
9
2
2
1
2

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions