1. You are the Lift Director at a large construction site. The crane operator reports that the
matting under the outriggers is flexing more than usual during the pre-lift check. What is the
most appropriate action?
A) Proceed with the lift but reduce the load weight by 10%.
B) Stop the lift and inspect the ground condition and cribbing for settling, then upgrade the
matting if necessary.
C) Continue the lift as planned because the operator is experienced.
D) Tell the operator to raise the outriggers and reposition the crane.
1
SUCCESS!
,Page 2 of 154
Answer: B
Ground support failure is a critical safety issue. The LD must verify the surface and cribbing to
ensure they can support the crane and load per ASME B30.5 requirements.
2. During a pre-lift meeting, you discover that the signal person assigned is not qualified. Under
ASME B30.5, your responsibility as Lift Director is to:
A) Allow the signal person to communicate via radio only.
B) Appoint a qualified signal person and ensure they are trained and competent.
C) Ask the operator to ignore the signal person and rely on hand signals from a ground worker.
D) Proceed with the lift but station a supervisor next to the unqualified signal person.
Answer: B
The LD is responsible for appointing qualified signal persons and verifying their competence.
Using an unqualified signal person violates OSHA and ASME standards.
3. The project manager refuses to stop operations despite unsafe wind conditions. As Lift
Director, you:
2
SUCCESS!
,Page 3 of 154
A) Order a stop to lifting operations until conditions improve.
B) Document the objection and continue as directed by the PM.
C) Ask the crane operator to make the decision.
D) Reduce the crane’s radius until the wind subsides.
Answer: A
The LD has the authority to stop crane operations when unsafe conditions exist, regardless of
pressure from management. Safety overrides production.
4. You are reviewing a lift plan for a multi-crane lift of a heavy vessel. At the pre-lift meeting, the
crane operator asks who calculates the net capacity for each crane. What do you tell them?
A) The site supervisor is responsible for all net capacity calculations.
B) The rigging foreman calculates net capacity based on the lift plan.
C) You, as the Lift Director, provide the gross capacity; the operator calculates net capacity by
subtracting rigging and deductions.
D) The project engineer calculates net capacity.
3
SUCCESS!
, Page 4 of 154
Answer: C
Per NCCCO guidelines, the crane operator is responsible for calculating net capacity
(manufacturer’s rated capacity minus capacity deductions). The LD ensures the operator has the
correct information.
5. The crane operator notices the load chart indicates a required number of parts of line for the
planned lift. What is your role regarding this configuration?
A) Verify that the reeving matches the load chart and that the operator has correctly calculated
the parts of line.
B) Leave the reeving to the operator’s discretion.
C) Approve any reeving as long as the total load is less than 75% of capacity.
D) Refer the reeving decision to the rigging supplier.
Answer: A
The LD must confirm that the crane’s configuration, including reeving, matches the lift plan and
load chart. Improper reeving can lead to catastrophic failure.
4