Support Operations PH II Pre Exam Study Guide
SPO Phase 1 Actual Exam 2026/2027 – Complete
Exam-Style Questions with Detailed Rationales | 100%
Verified – Pass Guaranteed – A+ Graded
Q1: Which class of supply includes repair parts and components, including kits, assemblies, and
subassemblies required for the maintenance of equipment?
A. Class II
B. Class V
C. Class IX [CORRECT]
D. Class VII
Correct Answer: C
Rationale: Correct because Class IX is the designated supply class for repair parts and
components to include end items, assemblies, subassemblies, and kits.
Q2: During a convoy operation, which document is used to manifest all personnel and cargo
being transported to ensure accountability and tracking?
A. DA Form 2064
B. DD Form 175
C. TC Movement Order [CORRECT]
D. SF 364
Correct Answer: C
Rationale: Correct because the TC Movement Order provides the authorization and detailed
manifest for moving personnel and equipment, serving as the primary tracking document during
convoy operations.
Q3: What is the primary purpose of the Unit Maintenance Collection Point (UMCP)?
,2
A. To perform field-level maintenance on all organic vehicles.
B. To collect, classify, and evacuate direct support maintenance failures. [CORRECT]
C. To store Class V ammunition for forward units.
D. To serve as the central issuing point for organizational clothing.
Correct Answer: B
Rationale: Correct because the UMCP functions as the consolidation point where units drop off
equipment requiring direct support (DS) maintenance for classification and further evacuation to
the Support Maintenance Company.
Q4: Which of the following accurately describes the concept of "Tailgate" support?
A. Delivering supplies from the Support Operations Center directly to the user's vehicle.
B. Supplying units at their location directly from the transportation mode. [CORRECT]
C. Using rotary-wing assets to sling-load supplies to isolated outposts.
D. Distributing supplies through a central distribution point that units must visit.
Correct Answer: B
Rationale: Correct because tailgate support involves the delivery of cargo from the transportation
carrier directly to the using unit's location, eliminating the need for the unit to travel to a supply
point.
Q5: In the context of maintenance operations, what is the definition of "Cannibalization" (Cann)?
A. Removing serviceable parts from a deadlined vehicle to place on another mission-capable
vehicle. [CORRECT]
B. The process of stripping a vehicle for parts before salvage.
C. The authorized exchange of parts between two operational vehicles.
D. A maintenance inspection required after 1,000 miles of operation.
Correct Answer: A
,3
Rationale: Correct because cannibalization is the authorized removal of serviceable parts,
assemblies, or components from an unserviceable asset to place on another asset to restore it to
mission capability, pending proper documentation.
Q6: Which individual is personally responsible for the property issued to them and is required to
sign a hand receipt accepting that responsibility?
A. The Supply Sergeant
B. The Property Book Officer (PBO)
C. The accountable officer/individual [CORRECT]
D. The Unit Commander
Correct Answer: C
Rationale: Correct because the accountable officer or individual is the person who actually signs
the hand receipt and accepts direct responsibility for the property listed on that receipt.
Q7: What is the primary method for transporting bulk petroleum products (Class III) in a theater
of operations?
A. 5,000-gallon tanker trucks
B. Pipelines and 5,000-gallon tanker trucks [CORRECT]
C. 55-gallon drums via flatbed trailer
D. Helicopter sling-load operations
Correct Answer: B
Rationale: Correct while pipelines are the most efficient for large volumes, tanker trucks
(typically 5,000-gallon semitrailers) serve as the primary tactical means for distribution when
pipelines are not available.
Q8: Which phase of the SPO (Support Operations) cycle focuses on determining support
requirements based on the commander's intent and mission analysis?
A. Execution Phase
, 4
B. Planning Phase [CORRECT]
C. Assessment Phase
D. Transition Phase
Correct Answer: B
Rationale: Correct because the Planning Phase is where support requirements are determined,
courses of action are developed, and the logistic estimate is prepared to align with the
commander's intent.
Q9: During a SPO Battle Drill, what is the immediate action taken upon receipt of a "MASCAL"
(Mass Casualty) warning?
A. Establish a collection point for remains.
B. Implement the unit MASCAL plan to treat and evacuate casualties. [CORRECT]
C. Secure the perimeter of the SPO.
D. Contact the mortuary affairs collection point.
Correct Answer: B
Rationale: Correct because the immediate priority is saving lives; the MASCAL plan directs the
setup of triage, treatment, and evacuation stations to handle the surge in casualties.
Q10: What publication prescribes policies and procedures for property accountability in the
Army?
A. AR 750-1
B. AR 735-5 [CORRECT]
C. FM 4-30.31
D. DA PAM 710-2-1
Correct Answer: B