Common standard time period for station battery to handle outage of AC power to
chargers - ANSWER -8-12 hours
- QUESTION- Time to restore data exchange redundancy when redundancy testing
by RC/TOP/BA deemed unsuccessful - ANSWER -2 hours
- QUESTION- Transition period to backup control facility (fully functioning) -
ANSWER -2 hours
- QUESTION- Annual testing of backup control facility must prove to be functional
for this long - ANSWER -2 hours
- QUESTION- Every 2 years TO/TOP/DSP must provide how many hours of system
restoration training to field switching personnel - ANSWER -2 hours
- QUESTION- Every 2 years GOP's with blackstart resources shall provide how
many hours of training to operating personnel responsible for startup - ANSWER -
2 hours
- QUESTION- BAL-002 default contingency reserve restoration period (following
disturbance recovery period) - ANSWER -90 minutes
, - QUESTION- How often should BA calculate and record inadvertent interchange -
ANSWER -60 minutes/hourly
- QUESTION- How often should BA provide MW-hour meter readings to adjacent
BA's - ANSWER -60 minutes/hourly
- QUESTION- TLR procedure (identifying TLR level and actions to be
implemented) needs updating how often - ANSWER -60 minutes/hourly
- QUESTION- Hourly ATC for next 48 hours calculated how often - ANSWER -
60 minutes/hourly
- QUESTION- During EEA2/3 the energy deficient entity needs to update the RC
how often until alert is terminated - ANSWER -60 minutes/hourly
- QUESTION- DOE-417 (disturbance reporting) should be completed by when -
ANSWER -60 minutes
- QUESTION- BA with loss of resources must submit RFI with start time no more
than how far beyond the resource loss - ANSWER -60 minutes
- QUESTION- Sink BA should ensure interchange modifications are submitted how
soon after the modification - ANSWER -60 minutes
- QUESTION- If unable to calculate ACE for this long, BA must notify RC -
ANSWER -30 minutes