Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

APPRENTICE LINEMAN YEAR 3 EXAM QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 3 out of 16 pages

APPRENTICE LINEMAN YEAR 3 EXAM QUESTIONS AND ANSWERS

Content preview

APPRENTICE LINEMAN YEAR 3 EXAM
QUESTIONS AND ANSWERS



Select the three common types of URD Systems - Correct Answers -Double Feed,
Radial Feed, and Loop Feed

True or False: A URD system is usually connected to the overhead primary distribution
lines at a cable or riser pole. - Correct Answers -True

True or False: Customers using three-phase equipment on a URD system must be
powered by a set of three-phase conductors separate from the rest of the URD. -
Correct Answers -False

True or False: A loop feed system can be converted into an open loop system by
opening any switching point of the system. - Correct Answers -True

True or False: An open loop system is the same as two radial feed systems that have
the capability to be joined. - Correct Answers -True

A _____________ protects a URD system from over-voltages. - Correct Answers -
Surge Arrestor

A pad-mounted switch that connects a URD system to an underground feeder cable is
called a - Correct Answers -Transclosure

Select the types of equipment often found on cable poles. - Correct Answers -Surge
protectors, pothead, disconnect switches, and fuses.

True or False: Dead-front transformers are fully insulated and can be switched by a
lineman using rubber gloves. - Correct Answers -False

Select the three types of transformer installations in URD systems. - Correct Answers -
Direct-buried, pad-mounted, subsurface.

True or False: Tap holes are used to energize and de-energize transformers - Correct
Answers -False

True or False: URD cable is often made of softer alloys then overhead cable. - Correct
Answers -True

,One a large customer of three-phase power is associated with a URD system, the
system may be fed directly from a ___________ through an underground feeder. -
Correct Answers -Substation

What are the functions of a pothead? - Correct Answers -Terminate the URD cable
insulation, Provide the connection between overhead cable and URD cable

True or False: URD cable can be installed in the same trench with other types of cable
and utilities. - Correct Answers -True

When a URD cable must go under a building, a parking lot, or a street, it is often
installed in _________ to make replacing the cable easier. - Correct Answers -Conduit

Before opening a pad-mounted transformer, a Lineman should perform a __________
to make sure all equipment appears safe. - Correct Answers -Visual Inspection

True or False: during a transformer inspection, a lineman uses a system diagram to tag
all unmarked cables. - Correct Answers -False

True or False: at a pad-mounted switch, a lineman checks the position of each switch
against the system diagram and returns each switch to the correct position. - Correct
Answers -False

__________ allow several different cables to be connected at one point. - Correct
Answers -Terminal Strips

Which of the following can be a valuable source of information during troubleshooting? -
Correct Answers -The troubleman's experience, customers and eyewitnesses, and a
dispatcher

True or False: if only one customer loses power, while other surrounding customers
have normal service, troubleshooting should begin by checking the main feeder. -
Correct Answers -False

Which of the following is NOT a method of locating a problem? - Correct Answers -
Documenting

True or False: troubleshooting ends as soon as a problem is located. - Correct Answers
-False

True or False: patrolling is scheduled only when specific problems have been reported
on a line. - Correct Answers -False

A Troubleman should always treat lines and equipment as if they are _____________. -
Correct Answers -Energized

, Problems on overhead distribution lines can be related to - Correct Answers -Hardware,
wires, poles, equipment

True or False: safety is an important part of troubleshooting - Correct Answers -True

Which of the following can be used by a Troubleman to establish his location? - Correct
Answers -Pole identification numbers, street addresses, landmarks

The dispatcher may provide a Troubleman with clearance, instructions, and other
information. - Correct Answers -True

A common troubleshooting safety practices verifying information by - Correct Answers -
Reading all information back to the dispatcher, writing down the dispatchers instructions

True or False: before performing any work on on a line, a Troubleman should know
what the results of the work will be - Correct Answers -True

A line may be sectionalized by opening - Correct Answers -A gang-operated air switch,
a fused cutout, a recloser

True or False: cutting a jumper is a way of sectionalizing a line - Correct Answers -True

A line break is usually installed when - Correct Answers -There is no convenient switch
to open, there is no convenient place to remove a hot tap or cut a jumper

Using the following illustration, if trouble on the line causes a substation circuit breaker
to open, one logical place to begin patrolling for the problem is - Correct Answers -
Between the circuit breaker and the first switch

Using the following illustration, if a portion of the sectionalized primary line is re-
energized, and remains energized then - Correct Answers -That section may have no
problem

True or False: phase-to-ground voltage is tested by connecting both voltage tester
probes to the ground terminal - Correct Answers -False

If two customers are serviced by the same distribution transformer, and both are without
service, the problem is likely to be - Correct Answers -In the secondary main, the
transformer, or before the transformer

With the transformer fuse intact, a no voltage output reading at a distribution
transformer could indicate - Correct Answers -A problem somewhere in the source
circuit, a problem somewhere in the transformer

Document information

Uploaded on
April 15, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
millyphilip
3.6
(555)
Sold
2963
Followers
1963
Items
45958
Last sold
1 day ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions