COR TRAINING QUESTIONS AND ANSWERS
2025 26 COMPLETE KNOWLEDGE EVALUATION
◉ Establish and maintain individual COR files for each contract/task
&delivery orders. at a Minimum should include: Answer: -Evidence that
the form OGE 450 is completed annually, when assigned.
-Written communications with the contractor and or KO
-Evidence CPAR input has been verified on service contracts
-Documentation of telephone conversations and meeting with the
contractor and/ or the contracting officer.
◉ COR Terminations. Answer: A COR may be terminated by the KO
when performance is unsatisfactory, or due to transfer, retirement , or
other causes.
◉ Unauthorized Changes. Answer: A COR is not authorized to make
any commitments or changes that will affect price, quality, quantity, or
any other term or condition of the contract. ( also important: a COR will
neither delegate nor re-delegate any COR responsibilities that were
delegated by the KO)
◉ Implied authority. Answer: given by presumption but is still based on
the appointment letter
, ◉ Reports. Answer: COR status reports, surveillance schedules and
checklists must be in SPM by the 15th of each month, for the prior
month
◉ Alternate COR (ACOR) acts in the absence of the primary when:.
Answer: multiple regions or remote geographic locations of performance
exists, the contract is complex or there is performance risk, there is a
need for increased surveillance, or the magnitude of the requirement is
great.
◉ Contract Technical Review. Answer: should always include: the
contract, the statement of work, performance requirements summary,
performance work statement, service/technical item description/data
package, system requirements, schedule, and contract exhibits
◉ government inspections and tests are for the sole benefit of the
government and do not. Answer: relieve the contractor of responsibility
for providing adequate quality control measures, constitute or imply
acceptance
◉ choose the best written task for PRS statement (this is looking for the
wrong answer). Answer: Contractor will use the GFE IOT provide not
less than six# of ice per soldier per day and will ensure the process..
(TRUE)
2025 26 COMPLETE KNOWLEDGE EVALUATION
◉ Establish and maintain individual COR files for each contract/task
&delivery orders. at a Minimum should include: Answer: -Evidence that
the form OGE 450 is completed annually, when assigned.
-Written communications with the contractor and or KO
-Evidence CPAR input has been verified on service contracts
-Documentation of telephone conversations and meeting with the
contractor and/ or the contracting officer.
◉ COR Terminations. Answer: A COR may be terminated by the KO
when performance is unsatisfactory, or due to transfer, retirement , or
other causes.
◉ Unauthorized Changes. Answer: A COR is not authorized to make
any commitments or changes that will affect price, quality, quantity, or
any other term or condition of the contract. ( also important: a COR will
neither delegate nor re-delegate any COR responsibilities that were
delegated by the KO)
◉ Implied authority. Answer: given by presumption but is still based on
the appointment letter
, ◉ Reports. Answer: COR status reports, surveillance schedules and
checklists must be in SPM by the 15th of each month, for the prior
month
◉ Alternate COR (ACOR) acts in the absence of the primary when:.
Answer: multiple regions or remote geographic locations of performance
exists, the contract is complex or there is performance risk, there is a
need for increased surveillance, or the magnitude of the requirement is
great.
◉ Contract Technical Review. Answer: should always include: the
contract, the statement of work, performance requirements summary,
performance work statement, service/technical item description/data
package, system requirements, schedule, and contract exhibits
◉ government inspections and tests are for the sole benefit of the
government and do not. Answer: relieve the contractor of responsibility
for providing adequate quality control measures, constitute or imply
acceptance
◉ choose the best written task for PRS statement (this is looking for the
wrong answer). Answer: Contractor will use the GFE IOT provide not
less than six# of ice per soldier per day and will ensure the process..
(TRUE)