THE BMZ ACADEMY
053 8213
BMZ ACADEMY 061 262 1185/068 053 8213Page 1 of 20
, THE BMZ ACADEMY
Table of Contents
Question 1: Localisation Compliance Assessment ..................................................... 4
a) Identification of Suppliers Below the Localisation Requirement ............................. 4
b) Compliance Concerns Related to the Identified Suppliers ..................................... 4
Question 2: Strategic Risk Implications ...................................................................... 5
Supplier Dependency and Availability of Alternatives ................................................ 5
Delivery Reliability and Milestone Adherence ............................................................ 6
Operational Stability and Innovation Capability .......................................................... 6
Comparative Strategic Risk Assessment ................................................................... 7
Question 3: Weighted-Point Evaluation and Managerial Interpretation ...................... 7
a) Identifying the Supplier Requiring the Highest Level of Managerial Attention ........ 7
b) Revised Weighted-Point Calculation ...................................................................... 8
c) Limitation of the Weighted-Point Method................................................................ 9
Question 4: Asset Specificity and Dependency Risk ................................................ 10
Supplier with the Highest Asset Specificity............................................................... 10
Supplier with Moderate Dependency and Low Dependency .................................... 11
Moderate Dependency: KZN Metals ........................................................................ 11
Low Dependency: GridSync Technologies............................................................... 11
Influence of Supplier Dependency on Governance Intensity .................................... 12
Question 5: ERP Integration and Governance Control ............................................. 12
Role of ERP Integration in Improving Monitoring ..................................................... 12
Authority Advantage of ERP Integration ................................................................... 13
Question 6: KPI Collision and Behavioural Consequences ...................................... 13
Potential Conflict Between Key Performance Indicators .......................................... 13
Behavioural Consequence of Overemphasising a Single KPI .................................. 14
Proposed KPI Weightings for the Pilot Phase .......................................................... 15
Question 7: Escalation Mechanisms and Governance Response ............................ 16
BMZ ACADEMY 061 262 1185/068 053 8213Page 2 of 20
, THE BMZ ACADEMY
Need for a Structured Escalation Process................................................................ 16
Stage One: Operational Corrective Action ............................................................... 16
Stage Two: Senior Management Escalation and Strategic Intervention ................... 17
Reference List .......................................................................................................... 18
BMZ ACADEMY 061 262 1185/068 053 8213Page 3 of 20