• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

NERC Test 2 Questions with Complete Solutions

Document preview thumbnail
Preview 2 out of 11 pages

NERC Test 2 Questions with Complete Solutions

Content preview

NERC Test 2 Questions with Complete
Solutions11

Which of the following situations would warrant the Reliability Coordinator to initiate a NERC RC
conference call?



A. Energy Emergency Alert 3

B. Code of Conduct violation

C. Interchange transaction error

D. 115 kV capacitor tripping - ANSWERS-Energy Emergency Alert 3



The next day security analysis performed by the RC shall ensure that _________.



A. the bulk power system can be operated in anticipated normal and contingency conditions

B. all unavailable generation and transmission made available

C. all interchange is scheduled

D. the load forecast is within 5% of actual - ANSWERS-the bulk power system can be operated in
anticipated normal and contingency conditions



If the estimated charging incurred from switching a 500 kV line in service is 1.7 MVAR per mile,
what would be incurred if a 100 mile long 500 kV line were switched in service?



A. 85 MVAR

B. 170 MVAR

C. 850 MVAR

D. It cannot be calculated with the information provided - ANSWERS-170 MVAR

, All of the following are reasons to notify other systems through predetermined communication
paths EXCEPT:



A. Insufficient resources

B. Lack of single contingency coverage

C. Sabotage incident

D. Loss of 10 MW of load - ANSWERS-Loss of 10 MW of load ?



What would be the most likely event if the frequency in your Balancing Authority Area declines
and the interchange out of your area increased?



A. An internal generator tripped

B. An external generator tripped

C. Internal load was lost

D. External load was lost - ANSWERS-An external generator tripped



What is the major role of the EMS State Estimator?



A. Identifies the contingencies that exist on the power system

B. Estimates the system load that is anticipated at the peak of the day

C. Calculates SE values based on telemetered data and system model

D. Establishes the values that the system operator must operate within - ANSWERS-Calculates
SE values based on telemetered data and system model



Which of the following is NOT an indication of pending voltage collapse?

Document information

Uploaded on
March 28, 2026
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bensuda
3.7
(168)
Sold
919
Followers
445
Items
23105
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions