(ICC) General Requirements Special Inspector Certification Exam Preparation Guide: Comprehensive Review with 200 Updated Practice Questions and Verified Correct Answers

Institution
General Requirements Special Inspector Cert
Course
General Requirements Special Inspector Cert

Content preview

(ICC) General Requirements Special Inspector Certification
Exam Preparation Guide: Comprehensive Review with 200
Updated Practice Questions and Verified Correct Answers
Who should NOT hire the special inspector?


a) The Building Official
b) The Contractor
c) The Owner
d) The RDP - Answer - b) The Contractor


Whose job is it to ensure that the special inspector has an approved set of plans?


a) The Building Official
b) The Contractor
c) The Owner
d) The RDP - Answer - b) The Contractor


Who is in charge of giving "approval to proceed"?


a) The Building Official
b) The Contractor
c) The Owner
d) The RDP - Answer - a) The Building Official


Can a material not listed in the IBC be used for construction?


a) Yes
b) No - Answer - a) Yes

,"Materials, equipment, and devices approved by the building official shall be constructed and
installed in accordance with such approval" -Section 104.9, IBC


Who performs a structural observation?
A) the RDP in responsible charge
B) The special inspector
C) The contractor
D) The building official - Answer - A) the RDP in responsible charge


Who prepares the statement of special inspections?
A) The building offficial
B) The contractor
C) The owner
D) The RDP - Answer - D) The RDP


Who is in charge of reviewing and approving reports?
A) The building offficial
B) The contractor
C) The owner
D) The RDP - Answer - D) The RDP


ICC exams are based on which document?


a) ACI
b) IBC
c) ASTM - Answer - B) IBC


Who is in charge of giving "approval to proceed"

,A) The building offficial
B) The contractor
C) The owner
D) The RDP - Answer - A


Who responds to reports of uncorrected discrepancies?
A) The building official
B) the contractor
C) The owner
D) The RDP - Answer - D) The RDP


What does a special inspector's job NOT entail while on the job site?
A) instructing the contractor;s workers on how to do their job
B) Verify means and methods of construction
C) Inform the contractor of arrival
D) Discuss with the contractor any discrepancies as they may come up later in a lawsuit -
Answer - A) Instructing the contractor's workers on how to their job


What should a special inspector NOT do prior to arriving to the jobsite?
A) Attend a preconstruction meeting
B) Review the construction documents
C) Discuss frequency of reports with the building official
D) Ask any questions you may have - Answer - A) Attend a preconstruction meeting


Which of the following should a special inspector contact the contractor about immediately?
A) If the concrete temperature is 80 degrees
B) If the slump calls for a maximum of 4' but is 6'
C) If the air content calls for 6% but is 3%
D) If the steel isn't tied properly - Answer - B and C

, Can a material not listed in the IBC be used for construction?
A) Yes
B) No - Answer - A


Who should NOT hire the special inspector?
A) The building official
B) The contractor
C) The Owner
D) The RDP - Answer - B


Who's job is it to ensure that the special inspector has an approved set of plans?
A) The building offficial
B) The contractor
C) The owner
D) The RDP - Answer - B


Who should the special inspector notify upon arrival to the jobsite?
A) The building offficial
B) The contractor
C) The owner
D) The RDP - Answer - B


A basic knowledge in which subject is NOT required to be a special inspector?
A) Structural design
B) An understanding of construction documents
C) An understanding o the current codes
D) How to perform all test expected of you - Answer - A) Structural design

Written for

Institution
General Requirements Special Inspector Cert
Course
General Requirements Special Inspector Cert

Document information

Uploaded on
March 16, 2026
Number of pages
45
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • icc
$28.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
ExamGeek01

Get to know the seller

Seller avatar
ExamGeek01 Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
4 months
Number of followers
0
Documents
79
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions