100% Verified Answers
\.Traditionally, [] construction is most commonly associated with design/bid/build
construction. - ANSWERS -sequential
\.Each separate entity provides a system of checks and balance which increases
the quality of end product. - ANSWERS -Design/Bid/Build
\.For this project delivery method, there is a single point of accountability. -
ANSWERS -Design/Build
\.For this project delivery method, the owner hires separate design and
construction teams - ANSWERS -Design/Bid/Build
\.The Construction Manager at [] acts like a general contractor and takes greater
responsibility for construction quality, schedule, and costs - ANSWERS -risk
\.General Contractor (GC) assumes most financial risk - ANSWERS -fixed fee
\.This building type is considered to be the least performant in terms of fire
resistance - ANSWERS -type v
, \.IBC stands for - ANSWERS -International Building Code
\.Match the following terms to the proper definitions.
1.Occupancy Classifications
2.Model Building Codes
3.construction documents
4. specifications - ANSWERS -1.guidance based on the activities/ usage within a
building
2.lawful documents which provides building design guidance and performance
requirements
3.descriptions of how the building is to be built and consist of plans and
specifications
4.N/A
\.[] construction is most naturally suited to design/build and project delivery
where construction expertise is available during the design phases of the project. -
ANSWERS -phased
\.This building type is considered to be the most performant in terms of fire
resistance. - ANSWERS -type II
\.For this project delivery method, the owner hires a single design and
construction entity. - ANSWERS -design/build