Question 1
Which of the following is not a significant violation?

a) A violation that causes a liquid release of petroleum from a UST system
b) A violation that threatens to cause a liquid release of petroleum from a UST system
c) A violation that impairs the ability of a UST system to detect a liquid leak
d) A violation caused by failure of the owner or operator to provide financial responsibility
Correct Answer
(d) A violation caused by failure of the owner or operator to provide financial responsibility
23 CCR Section 2717(a) and (b)




Page 1 of 210

,Question 2
An unauthorized release from a leaking turbine pump head that is contained by the turbine sump, and cleaned up in less
than 8 hours must be recorded. These records must include all of the following, EXCEPT
a. A list of the types, quantities, and concentrations of hazardous substances released;
b. A description of the actions taken to control and clean up the release;
c. The method and location of disposal of the released hazardous substances (the monitoring record shall indicate whether
a hazardous waste manifest was or will be used);
d. The date, time and pertinent atmospheric conditions, including wind, temperature and rainfall.

Correct Answer
d. The date, time and pertinent atmospheric conditions, including wind, temperature and rainfall.
CCR; 2651



Question 3
The design and construction of all primary containment including any integral secondary containment system, shall be
approved by an independent testing organization in accordance with any of the following, EXCEPT
a. Industry codes
b. Local agency standards developed by the State water Resources Control Board
c. Voluntary consensus standards
d. Engineering standards
Correct Answer
b. Local agency standards developed by the State water Resources Control Board
CCR; 2631 (b)




Page 2 of 210

,Question 4
Which of the following is exempt from secondary containment testing?

a) UDCs
b) Secondary piping
c) Monitored turbine sumps
d) Hydrostatically monitored annular space
Correct Answer
(d) Hydrostatically monitored annular space
CCR Title 23, sec 2637 (a)



Question 5
If a UST operating permit is issued to a person other than the operator of the UST system, that person shall do all of the
following, EXCEPT

a. Enter into a written agreement with the operator of the tank to monitor the tank system as set forth in the permit.
b. Provide the operator with a copy or summary of Section 25299 in the form that the board specifies by regulation.
c. Notify the local agency of any change of operator.
d. Periodically inspect the operator to ensure compliance with this chapter.
Correct Answer
d. Periodically inspect the operator to ensure compliance with this chapter.

H≻ 25284 (a)(3)




Page 3 of 210

, Question 6
What does not describe how suction piping is designed/constructed?
A) The below-grade piping operates at less than atmospheric pressure
B) Suction piping is continuously monitored
C) No valves or pumps are installed below grade in the suction line. Only one check valve is located directly below and as
close as practical to the suction pump
D) The below-grade piping is sloped so that the contents of the pipe will drain back into the storage tank if the suction is
released

Correct Answer
B) Suction piping is continuously monitored

§ 2636(a)(3). Design, Construction, Installation, Testing, and Monitoring Requirements for Piping
(3) Suction piping if the piping is designed, constructed, and installed as follows:
(A) The below-grade piping operates at less than atmospheric pressure (suction piping);
(B) The below-grade piping is sloped so that the contents of the pipe will drain back into the storage tank if the suction is
released (gravity-flow piping);
(C) No valves or pumps are installed below grade in the suction line. Only one check valve is located directly below and
as close as practical to the suction pump; and
(D) An inspection method is provided which readily demonstrates compliance with subparagraphs (A) through (C) above




Page 4 of 210

Document information

Uploaded on
March 7, 2026
Number of pages
210
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorExpert
3.7
(76)
Sold
567
Followers
314
Items
10285
Last sold
9 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions