NICET LEVEL 1 HIGHWAY CONSTRUCTION LASTEST ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS QUESTIONBidder - answer-The individual, firm, partnership, corporation, joint venture, or any acceptable combination thereof that submits a bid to the Department. QUESTIONbridge - answer-. A structure, other than a culvert, including supports, erected over a depression or an obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length 3 measured along the center of the structure of more than 20 feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure dimensions are defined as follows:

Content preview

NICET LEVEL 1 HIGHWAY
CONSTRUCTION LASTEST ACTUAL
EXAM QUESTIONS AND CORRECT
DETAILED ANSWERS



QUESTIONBidder - answer-The individual, firm, partnership,
corporation, joint venture, or any acceptable combination thereof
that submits a bid to the Department.

QUESTIONbridge - answer-. A structure, other than a culvert,
including supports, erected over a depression or an obstruction,
such as water, highway, or railway, and having a track or
passageway for carrying traffic or other moving loads and having
a length 3 measured along the center of the structure of more
than 20 feet between undercopings of abutments or extreme ends
of openings for multiple boxes. Structure dimensions are defined
as follows:

QUESTIONbridge length - answer-The overall length measured
along the line of survey stationing from back to back of backwalls
of abutments, if present, otherwise end to end of the bridge floor;
but, in no case less than the total clear opening of the structure

Acceptance - answer-The written acceptance by the Department
of the Work.

, QUESTIONacceptance testing - answer-Testing conducted by the
Department to measure the degree of compliance to the Contract

QUESTIONactual cost - answer-The computed cost using
calculations provided

QUESTIONaddendum - answer-A Contract revision or response
to a Contractor inquiry issued after advertisement and before the
opening of bids.

QUESTIONas-built quantity - answer-The quantity of a completed
Item eligible for payment

QUESTIONauthorized funding amount - answer-The amount of
funds authorized by the Department for the Contract

QUESTIONbridge width - answer-The clear width measured at
right angles to the longitudinal centerline of the bridge between
the bottom of curbs, or in the case of multiple height of curbs,
between the bottoms of the lower risers or, if curbs are not used,
between inner faces of parapet or railing

QUESTIONChange Order. - answer-A written order issued by the
Department to the Contractor after execution of the Contract
authorizing one or more of the following: 1. Changes in the Work.
2. Modifications in the basis of payment. 3. Modifications to
Contract Time.

QUESTIONCommercially Useful Function - answer-Occurrences
in which the subcontractor is responsible for the execution of a
distinct element of the work of a contract and carrying out its
responsibilities by actually performing, managing, and supervising
the work involved, and with respect to materials and supplies
used on the contract, prepares the estimate, negotiates price,
determines quality and quantity, orders the material, arranges

Document information

Uploaded on
March 6, 2026
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$27.59

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
5
Followers
4
Items
518
Last sold
9 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions