Comprehensive Resource To Help You Ace 2026-2027
Includes Frequently Tested Questions With ELABORATED
100% Correct COMPLETE SOLUTIONS
Guaranteed Pass First Attempt!!
Current Update!!
1. Ten Acre Exemption - Correct Answer: 200 Foot Setback from Boundaries Does not
apply to ADEQ requirements
2. Fine up ——- to permit under ———- acres. - Correct Answer: $ 1000 10acres
3. Rules and Regulations Pertaining to Onsite Wastewater System Found on ADH Website -
Correct Answer: www.healthy.arkansas.gov
4. When was the last revision of rules? - Correct Answer: August 2019
5. How much is annual License Fee? - Correct Answer: $100
6. License Expires - Correct Answer: December 31
7. License Renewable - Correct Answer: January 1
8. ——-% Late Fee After ———? - Correct Answer: 50 % , March 1
,9. Delinquent for more than ———- requires retesting? - Correct Answer: one year
10. EHP - 19 - Correct Answer: Individual Onsite Wastewater System Application
11. THE APPROVED PERMIT must be completed by? - Correct Answer: Designated
Representative DR
12. THE APPROVED PERMIT includes? (7 items) - Correct Answer: -Individual Onsite
Wastewater System Application EHP 19
-Completed by Designated Representative
-Soil & Site Information
-Signed on Line 21 by Environmental Specialist
-Good for 1 year without Revalidation
-No Changes or Substitutions without DR's Authorization
-Installation Inspection and Permit for Operation
13. THE APPROVED PERMIT Signed on —— by who? - Correct Answer: Line 21
Environmental Specialist
14. THE APPROVED PERMIT Good for _______ without Revalidation? - Correct Answer: 1
year
15. No Changes or Substitutions without whos permission? - Correct Answer: DR's
Authorization
16. NEW PRODUCTS Reviewed & Authorized by Onsite Wastewater Product Review
Committee Listed On : - Correct Answer: services / topics / onsite -
www.healthy.arkansas.gov/programs wastewater
, 17. ____Hour Notice to ____Required Before Installation Begins - Correct Answer: 24
EHS
18. Who Must Be On Site During Entire Installation? - Correct Answer: Licensed Installer
19. Who May Authorize Designated Representative To Make Final Inspection? - Correct
Answer: EHS
20. Final Inspections May Be Conducted by :(2 people) - Correct Answer: -Environmental
Health Specialist
-Designated Representative installer
21. EHS May Authorize Designated Representative To Make Final Inspection If no final
inspection installer completes ____ of the EHP 19 and signs the System Installation
Verification Section - Correct Answer: Part 2
22. In addition installer must sign and submit the Installation Specification Sheet EHP - 6 ) to
the local _____ within _____ days? - Correct Answer: health unit , 5 working days
23. ___ Feet From High Water Mark of Lakes If Within ___ Mile of Water a Supply Intake
Structure - Correct Answer: 300, One Quarter ( 1/4)
24. Water Feet From Any Spring Used as a Source of Domestic Water - Correct Answer:
300
25. Feet From a Domestic Water Well - Correct Answer: 100