A postaward orientation aids both Government and contractor personnel to: correct answers
Achieve a clear and mutual understanding of all contract requirements and identify and resolve
potential problems
FAR 42.501
When late in paying an otherwise acceptable invoice, the Government will: correct answers Pay
an interest penalty
FAR 32.907(a)
When acquiring commercial items, quality assurance is primarily the responsibility of: correct
answers The contractor
FAR 46.202-1
You have a requirement for an online subscription to Engineering News Record. The site owner
requires payment before they will provide the license code number to activate the annual
subscription. Which payment form is required? correct answers An advance payment
FAR 32.102(a)
What agency does DoD typically delegate contract administrative functions for supply contracts?
correct answers Defense Contract Management Agency
FAR 42.201(b)
A purpose of a postaward orientation is to: correct answers Achieve a clear and mutual
understanding of all contract requirements
42.501(a)
A contractor employee accidentally broke a test fixture that belongs to the Government and is
accountable to a Government contract. Generally speaking: correct answers Contractors are not
held liable for loss of Government property
FAR 45.104
According to the FAR, the acquisition team: correct answers Includes the contractor
FAR 1.102-3
, With limited exceptions, a Contractor Performance Assessment Reporting System (CPARS)
report is required: correct answers When the contract dollar value exceeds the simplified
acquisition threshold
FAR 42.1502(b)
To be determined responsible by a contracting officer, a prospective contractor must: correct
answers Have adequate financial resources to perform the contract, or the ability to obtain them
FAR 9.104-1(a)
In ensuring overall quality of items and services received under a contract, which of the
following is the responsibility of the Government? correct answers Quality assurance
surveillance
FAR subpart 46.1
The Government's preferred remedy to nonconforming goods or services is: correct answers
Allow the contractor to repair or replace the nonconforming items, as long as there is still time
left within the required delivery schedule
FAR 46.407
Quality assurance policies and procedures found in FAR part 46: correct answers Apply to both
the Government and contractor
FAR 46
Contractors are responsible for: correct answers Tendering to the Government for acceptance
only those supplies or services that conform to contract quality requirements
FAR 46.105
Does the Government have the right to inspect a product before it is accepted? correct answers
Yes, always
FAR 52.246-2
When does title for a completed product transfer to the Government, assuming the product meets
all contract requirements? correct answers Upon formal acceptance by the Government
FAR 46.505(a)
In commercial contracting, what quality system is utilized? correct answers The contractor's
FAR 12.208