NEVADA RESIDENTIAL REMODELING B7 EXAM
2026 MASTER PREPARATION MANUAL
◉ What is required for the installation of aerobic drip emitter
systems. Answer: drip emmiter
◉ when do you need an area fill mound. Answer: required for the
installation of an area fill system or a wisconsin mound system
◉ what are all these listed?. Answer: additional certification
modules that are required for specialized installation and work
practices
◉ all septic tank installers and pumpers must be certified by who?.
Answer: georgia department of public health, and may need more
specialized certifications depending on what they are doing, see
above
◉ Application process. Answer:
◉ as a contractor, what should you beware of before even starting.
Answer: no person may begin the physical development of a lot or
structure, where an onsite sewage management system will be used
,without first obtaining an on site sewage system construction
permit issued by the environmental health section of the county
◉ How does the process begin?. Answer: application for a permit by
the owner or developer of the property
◉ what should the application include ? 8 things. Answer: -name
and address of the property owner
-location of property
-a site plan including on site sewage system specification
-type of facility to be served
-type of water supply
-number of bedrooms and or estimated gallons of sewage flow per
day
-soil information
-additional information may be required such as location of trash
pits, water supply lines, utility lines, proposed swimming pools, etc
◉ Any facility having occupancy for two hours or more must provide
what. Answer: an approved on site sewage management system
◉ pit privies are an acceptable means of sewage disposal for a
facility---. Answer: not served by water under pressure
, ◉ any repairs, replacement, or additions to existing systems must
be. Answer: permitted and inspected
◉ what happens after completing the application process. Answer: a
site inspection is conducted
◉ when the inspection is occuring, the inspector considers
information supplied on the application such as. Answer: house
location, soil characteristics, absorption rates, ground water
conditions, rock conditions, lay of the land, bodies of water, streams,
and other factors
◉ when will notification of the completed permit be given to the
applicant. Answer: when the permit has been approved
◉ what will the approved permit include and examples. Answer:
minimum requirements for the septic system
(tank size, trench length, depth and width, and any special
conditions for the installation
◉ what are absorption field lengths generally determined by?.
Answer: number of bedrooms in the home or estimated gallons per
day water usage and the percolation rate of the soils at the site
2026 MASTER PREPARATION MANUAL
◉ What is required for the installation of aerobic drip emitter
systems. Answer: drip emmiter
◉ when do you need an area fill mound. Answer: required for the
installation of an area fill system or a wisconsin mound system
◉ what are all these listed?. Answer: additional certification
modules that are required for specialized installation and work
practices
◉ all septic tank installers and pumpers must be certified by who?.
Answer: georgia department of public health, and may need more
specialized certifications depending on what they are doing, see
above
◉ Application process. Answer:
◉ as a contractor, what should you beware of before even starting.
Answer: no person may begin the physical development of a lot or
structure, where an onsite sewage management system will be used
,without first obtaining an on site sewage system construction
permit issued by the environmental health section of the county
◉ How does the process begin?. Answer: application for a permit by
the owner or developer of the property
◉ what should the application include ? 8 things. Answer: -name
and address of the property owner
-location of property
-a site plan including on site sewage system specification
-type of facility to be served
-type of water supply
-number of bedrooms and or estimated gallons of sewage flow per
day
-soil information
-additional information may be required such as location of trash
pits, water supply lines, utility lines, proposed swimming pools, etc
◉ Any facility having occupancy for two hours or more must provide
what. Answer: an approved on site sewage management system
◉ pit privies are an acceptable means of sewage disposal for a
facility---. Answer: not served by water under pressure
, ◉ any repairs, replacement, or additions to existing systems must
be. Answer: permitted and inspected
◉ what happens after completing the application process. Answer: a
site inspection is conducted
◉ when the inspection is occuring, the inspector considers
information supplied on the application such as. Answer: house
location, soil characteristics, absorption rates, ground water
conditions, rock conditions, lay of the land, bodies of water, streams,
and other factors
◉ when will notification of the completed permit be given to the
applicant. Answer: when the permit has been approved
◉ what will the approved permit include and examples. Answer:
minimum requirements for the septic system
(tank size, trench length, depth and width, and any special
conditions for the installation
◉ what are absorption field lengths generally determined by?.
Answer: number of bedrooms in the home or estimated gallons per
day water usage and the percolation rate of the soils at the site