Concrete Reinforcement Code Test || 100% Certified Answers.
According to the special inspection manual who should the special inspector notify of their
presence on the job site? correct answers Contractor
Which of the following should be noted in your daily report? correct answers Concrete is being
poured at a 6 inch slump when the plans specify a 4 inch slump
What type of cement is frequently used during cold weather concreting? correct answers Type III
What is the minimum clear spacing for parallel #11 bars in a layer? correct answers 1db
If concrete for a structural desk has 1-1/2 inch course aggregate, what is the minimum clear
distance required between parallel individual reinforcing bars? correct answers 2 inches
Which of the following is required for the fabrication of steel embeds that will cast in a podium
deck, if the embeds are fabricated by an approved fabricator? correct answers No inspector
What is the minimum slump allowed for concrete that is specified 5 inch max? correct answers
2.5 inches
A special inspector is responsible for all of the following except correct answers Structural
Observation
During initial curing, cylinder concrete shall be stored within a temperature range of __________
correct answers 60-80 degrees
Whenever strength tests are cast, what other tests should be performed? correct answers
Temperature, slump, and air content
How often must strength tests for each class of concrete be taken? correct answers Every 150
cubic yards
After notifying a contractor of discrepancies, an RFI is issued by the Engineer and corrections
made according to RFI, what further action is required? correct answers No further action is
required
Three cores shall be taken for each strength test more than _________ below value F'c? correct
answers 500 psi
What is the minimum sized required sample when casting strength specimens? correct answers 1
cubic ft.
What is the minimum concrete coverage for conduits if the concrete is exposed to weather?
correct answers 1.5 in.
According to the special inspection manual who should the special inspector notify of their
presence on the job site? correct answers Contractor
Which of the following should be noted in your daily report? correct answers Concrete is being
poured at a 6 inch slump when the plans specify a 4 inch slump
What type of cement is frequently used during cold weather concreting? correct answers Type III
What is the minimum clear spacing for parallel #11 bars in a layer? correct answers 1db
If concrete for a structural desk has 1-1/2 inch course aggregate, what is the minimum clear
distance required between parallel individual reinforcing bars? correct answers 2 inches
Which of the following is required for the fabrication of steel embeds that will cast in a podium
deck, if the embeds are fabricated by an approved fabricator? correct answers No inspector
What is the minimum slump allowed for concrete that is specified 5 inch max? correct answers
2.5 inches
A special inspector is responsible for all of the following except correct answers Structural
Observation
During initial curing, cylinder concrete shall be stored within a temperature range of __________
correct answers 60-80 degrees
Whenever strength tests are cast, what other tests should be performed? correct answers
Temperature, slump, and air content
How often must strength tests for each class of concrete be taken? correct answers Every 150
cubic yards
After notifying a contractor of discrepancies, an RFI is issued by the Engineer and corrections
made according to RFI, what further action is required? correct answers No further action is
required
Three cores shall be taken for each strength test more than _________ below value F'c? correct
answers 500 psi
What is the minimum sized required sample when casting strength specimens? correct answers 1
cubic ft.
What is the minimum concrete coverage for conduits if the concrete is exposed to weather?
correct answers 1.5 in.