Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CONTRACT ADMINISTRATION || ALL ANSWERS ARE VALID 100%.

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
17-02-2026
Written in
2025/2026

CONTRACT ADMINISTRATION || ALL ANSWERS ARE VALID 100%.

Institution
CONTRACT ADMINISTRATION
Course
CONTRACT ADMINISTRATION

Content preview

CONTRACT ADMINISTRATION || ALL ANSWERS ARE
VALID 100%.
Contract Administration correct answers Implementation of T&C's of all contracts associated w/
a project based on systems, policies, laws, rules & regs

Contract Administration correct answers Used to control time, cost, quality & information flow
to satisfy owners goals & objectives

Responsibilities correct answers CM is NOT Responsible for writing, but can recommend
provisions

Responsibilities correct answers CM recommends provisions that meet industry stds, Project
Management Plan & Project Procedures Manual

Delivery Methods - Influences correct answers Budget, design, schedule, risk assessment,
owners level of expertise

Design Bid Build (D-B-B) correct answers

Design Bid Build (D-B-B) correct answers Owner bears risk prior to construction BUT
Contractor assumes risk & is responsible to perform after design, owner manages with funding,
design, approvals. CM acts as agent thru project delivery. Owner has more control, benefit from
price competition. More time consuming delivery method due to design & limited contractor
input then. More advasarial, exposure to claims from design flaws, low bid cheap construction
approach.

Design Bid Build (D-B-B) correct answers

Design-Build (D-B) correct answers Less risk for the owner, but owner must determine project
requirements up front

Design-Build (D-B) correct answers single pt of contact for owner, fixed price, joint venture,
construction firm takes on TOTAL responsibility for design & construction, little involvement
for owner other than key decisions, OWNER may want to supplement staff with a CM for tech
support

Design-Build (D-B) correct answers Advantages: single pt of responsibility, reduces pot.
Exposure for claims, incetive for shared savings, High risk for Contractors, "fast tracking"

Design-Build (D-B) correct answers Disadvantages: owner has less control, owner must have a
COMPLETE scope, pot. Fueds over initial scope,

Design-Build (D-B) correct answers Role of CM: CM acts as owners representative with project
team, assist with development of owners D-B team requirements & selection process, CM
reviews design for cost & overall owner requirements

, Multi-prime (M-P) correct answers Owner holds separate contracts for each trade & owner thru
CM Manages schedule & budget, CM used during design, benefit: can start construction on some
phases while in design

Multi-prime (M-P) correct answers Owner has authority to enforce schedule, terminate & pay
directly. CM admins contractors & can coord. Primes. BENEFITS: Time saving, cost saving,
better contract & schedule control.

Multi-prime (M-P) Phased Construction correct answers Can start portions of work early &
phase them. "fast track" method. Don't have to wait for full design. CM can directly procure
materials to avoid markup. CM responsibility to make sure initial & subsequent packages are bid
within budget. Owner begins work based on the CM's representation that the balance of job can
be bid & built within budget

Multi-prime (M-P) Trade Contracting correct answers Cost saving, better control. CM
coordinates contractors in owners best interest. Success=effective coord. Among primes & CM.
OWNER ASSUMES GREATER RISK OF PERFORMANCE. LACK OF SINGLE POINT OF
RESPONSIBILITY FOR PERFORMANCE MAY LEAVE HOLES.

CM-at-risk (CMAR) correct answers Benefits: relationships, contractor input during design, pot.
Cost security for owner, cost savings/sharing incentives, less exposure for owner on safety &
schedule

CM-at-risk (CMAR) correct answers Disadvantages: if CM gets Contract for Construction, the
CM no longer acts as an agent to the owner, pot. 4 adversarial relationships, owner loses control
of contingencies, disputes over scope, bid shopping, slow payment to trades, pot. Failure of CM
on scheduling, pot. loss of owner control during constr.

CM-at-risk (CMAR) correct answers CM is hired as OWNERS AGENT, Provides Pre-
construction services during design: advice on schedule, budet & constructability; with a
potential follow-on agreement for construction

CM-at-risk (CMAR) correct answers CM=GC during construction, hybrid. CM EARLY
involvement during design. CM holds riks of subbing work & gauranteeing completion for a
fixed, negotiated price following design. CM & owner negotiate GMP or fixed price which
includes the CM's estimate of the cost for remaining design features. Performance specs or
reduced specs may be used

CM-at-risk (CMAR) correct answers AKA- CM/independent contractor, CM/GC or CM GMP,
can begin construction prior to completion of design, "fast track"

Integrated Project Delivery (IPD) correct answers team based approach, contractually requires
owner, designer, cm & builder, risk is collectively managed & shared

Written for

Institution
CONTRACT ADMINISTRATION
Course
CONTRACT ADMINISTRATION

Document information

Uploaded on
February 17, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.39
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
View profile
Follow You need to be logged in order to follow users or courses
Sold
787
Member since
3 year
Number of followers
438
Documents
39533
Last sold
1 week ago
Reign Supreme Scholarly || Enlightened.

Get your revised study materials available here and elevate your educational outcomes. I have numerous verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. I am dedicated to offering you the best and unique learning content. You are encouraged to inquire further assistance from this end whenever need be. Kindly remember to leave your review, understanding your satisfaction is essential . We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Read more Read less
3.7

117 reviews

5
49
4
20
3
24
2
8
1
16

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions