HOME INSPECTOR BUNDLED EXAMS
CERTIFICATION EVALUATION TEST BANK
SOLVED 2026
⩥ A collar tie is found in:
A. the attic near the top plate
B. the basement between floor joists
C. a wall at the intersection of two walls
D. the upper third of the rafter length. Answer: D. the upper third of the
rafter length
⩥ A claims made, errors and omissions insurance policy includes claims
filed
A. during the time the policy is in effect.
B. after the policy has elapsed.
C. prior to the effective date.
D. while the inspector maintains any required licensing. Answer: A.
during the time the policy is in effect.
,⩥ On a previous work day, you left the cover off of the access to the
crawl space. A person fell the next day and was injured. Which of the
following insurance types will be used to pay damages?
A. Bonding.
B. General liability
C. Errors and omissions and broker liability
D. Claims made and occurrence Answer: B. General liability
⩥ A home inspection agreement is most likely to be interpreted using
which law?
A. Federal
B. State
C. County
D. Parish Answer: B. State
⩥ While inspecting a heat pump in the cooling mode, you measure a 28
degree F differential between the interior supply and return air. When the
ambient outdoor conditions are 92 degrees and 50% humidity, you
should suspect
A. the outdoor fan running too slowly.
B. an over heating compressor.
, C. a dirty air handler filter.
D. thermostat set too low. Answer: C. a dirty air handler filter.
⩥ When measuring the temperature differential between supply air and
return air in a central air conditioning system, on a humid summer day
the difference should be
A. 5 degree F and 15 degrees F.
B. 15 degree F and 20 degrees F.
C. 20 degree F and 30 degrees F.
D. 30 degree F and 45 degrees F. Answer: B. 15 degree F and 20 degrees
F.
⩥ While inspecting a metal framed building, you observe non-metallic
sheathed wire installed through standard cut-outs. Your report will
suggest
A. plastic grommets should be installed.
B. the wire must be removed and replaced with bx cable.
C. all the wiring must be re-run in rigid conduit from the ceiling.
D. all the wiring must be re-run in rigid conduit from the floor. Answer:
A. plastic grommets should be installed.
⩥ The ampacity of copper-clad aluminum is
CERTIFICATION EVALUATION TEST BANK
SOLVED 2026
⩥ A collar tie is found in:
A. the attic near the top plate
B. the basement between floor joists
C. a wall at the intersection of two walls
D. the upper third of the rafter length. Answer: D. the upper third of the
rafter length
⩥ A claims made, errors and omissions insurance policy includes claims
filed
A. during the time the policy is in effect.
B. after the policy has elapsed.
C. prior to the effective date.
D. while the inspector maintains any required licensing. Answer: A.
during the time the policy is in effect.
,⩥ On a previous work day, you left the cover off of the access to the
crawl space. A person fell the next day and was injured. Which of the
following insurance types will be used to pay damages?
A. Bonding.
B. General liability
C. Errors and omissions and broker liability
D. Claims made and occurrence Answer: B. General liability
⩥ A home inspection agreement is most likely to be interpreted using
which law?
A. Federal
B. State
C. County
D. Parish Answer: B. State
⩥ While inspecting a heat pump in the cooling mode, you measure a 28
degree F differential between the interior supply and return air. When the
ambient outdoor conditions are 92 degrees and 50% humidity, you
should suspect
A. the outdoor fan running too slowly.
B. an over heating compressor.
, C. a dirty air handler filter.
D. thermostat set too low. Answer: C. a dirty air handler filter.
⩥ When measuring the temperature differential between supply air and
return air in a central air conditioning system, on a humid summer day
the difference should be
A. 5 degree F and 15 degrees F.
B. 15 degree F and 20 degrees F.
C. 20 degree F and 30 degrees F.
D. 30 degree F and 45 degrees F. Answer: B. 15 degree F and 20 degrees
F.
⩥ While inspecting a metal framed building, you observe non-metallic
sheathed wire installed through standard cut-outs. Your report will
suggest
A. plastic grommets should be installed.
B. the wire must be removed and replaced with bx cable.
C. all the wiring must be re-run in rigid conduit from the ceiling.
D. all the wiring must be re-run in rigid conduit from the floor. Answer:
A. plastic grommets should be installed.
⩥ The ampacity of copper-clad aluminum is