final
/ /
exam
/ /
SOS questions with answers
/ // // // //
Of /
the
/ /
following,
/ /
which
/ /
control
/ /
system
/ /
would
/ /
be
/ /
affected
/ /
by
/ //
a /
difference
/ /
in
/ /
Net Actual Interchange and Net Scheduled Interchange?
/ // // // // // //
a. Automatic Voltage Regulator
// // //
b. Reactive Control
// //
c. Automatic Generation Control
// // //
,d. /
Turbine
/ /
Governor Control - CORRECT ANSWERS(S)✔✔c. Automatic
/ // // // // //
Generation Control
// //
Feedback: BAL- //
005, /
Automatic
/ /
Generation
/ /
Control
/ /
(AGC)
/ /
Equipment
/ /
automatically
/ /
adjusts
/ /
generation
/ /
in
/ //
a /
Balancing
/ /
Authority
/ /
Area
/ /
from
/ //
a /
central
/ /
location
/ /
to
/ /
maintain
/ /
the
/ /
Balancing
/ /
Authority's
/ /
,interchange
/ /
schedule
/ /
plus
/ /
Frequency
/ /
Bias.
/ /
AGC
/ /
is
/ //
a /
process
/ /
designed
/ /
and
/ /
used
/ /
to
/ /
adjust
/ //
a /
Balancing
/ /
Authority
/ /
Areas'
/ /
Demand
/ /
and
/ /
resources
/ /
to
/ /
help
/ /
maintain
/ /
the
/ /
Reporting ACE in that of a Balancing Authority Area within
/ // // // // // // // // //
the
// /
bounds required by applicable NERC Reliability Standards.
/ // // // // // //
Governors
// /
arrest
/ /
, frequency
/ /
deviations,
/ /
but
/ /
Automatic
/ /
Generation
/ /
Control
/ /
(AGC)
/ /
maintains
/ /
generation
/ /
to
/ //
a /
schedule.
/ /
It
/ /
does
/ /
this
/ /
by
/ /
pulsing
/ /
the
/ /
generator
/ /
governors
/ /
to either increase or decrease megawatt as needed.
/ // // // // // // //
How /
is
/ /
the
/ /
Frequency
/ /
Response
/ /
Obligation
/ /