100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

IME 456 EXAM II QUESTIONS AND ANSWERS.

Beoordeling
-
Verkocht
-
Pagina's
6
Cijfer
A+
Geüpload op
03-02-2026
Geschreven in
2025/2026

IME 456 EXAM I QUIZZES QUESTIONS AND ANSWERS Project Objective - CORRECT ANSWERThe _______________ usually states the time by which a project scope must be completed in terms of the specific date agreed upon by the sponsor.

Instelling
IME 456
Vak
IME 456

Voorbeeld van de inhoud

IME 456 EXAM II QUESTIONS AND ANSWERS
The project manager should set the tone for encouraging open and timely discussion of risks among the
project team (T/F) - CORRECT ANSWER✅✅true



__ includes determining which risks may adversely affect the project objective and what the impact of
each risk might be if it occurs - CORRECT ANSWER✅✅Risk Identification



Waiting for unfavorable events to occur and then reacting to them __ - CORRECT ANSWER✅✅often
results in panic and costly responses.



Risks are prioritized based on __ - CORRECT ANSWER✅✅the likelihood of occurrence and degree of
impact.



Risks ___ should be given higher priority because if the risk occurs, it would have a greater impact on
the schedule - CORRECT ANSWER✅✅on the critical path



The fourth and final phase of the project life cycle is __ - CORRECT ANSWER✅✅closing the project



Successful projects should end with some type of __ - CORRECT ANSWER✅✅recognition and
celebration



If a project is cancelled mid-stream, the project closure phase should be skipped (T/F) - CORRECT
ANSWER✅✅False



Hold __ meetings at the end of the project with team members to have feedback from each team
member about their performance and how to improve future projects. - CORRECT
ANSWER✅✅individual



During project closing, the project team or contractor should ensure that copies of appropriate project
documentation are properly stored so that __ - CORRECT ANSWER✅✅they can be readily retrieved for
future use.

, A _______ identifies the various documents, who is responsible for creating each document, by when or
how frequently the document must be distributed, to whom each document is to be distributed, and
what action each recipient is expected to take. - CORRECT ANSWER✅✅project communication plan



Body language can be used not only by the person talking, but also by the listener, as a way of providing
feedback to the person talking. (T/F) - CORRECT ANSWER✅✅TRUE



It is important to keep in mind that a progress report is not - CORRECT ANSWER✅✅an activity report



Teleconferencing can help facilitate the sharing of information in a more interactive way than perhaps
email. (T/F) - CORRECT ANSWER✅✅True



Project team members have a lot of free time, and typically really love to read unnecessarily long
documents; for these reasons, it is imperative that a project manager strive to draft exceptionally
lengthy project status report documents, and then require that the team members read them on short
notice. - CORRECT ANSWER✅✅False



The _______ needs to be updated as stakeholders or their information needs change, or if new people
or new documents are identified. - CORRECT ANSWER✅✅project communication plan



After the meeting, the project manager should publish the meeting results - CORRECT
ANSWER✅✅within 24 hours after the meeting



The primary purposes of a __________ are to inform, to identify problems, and to identify action items.
- CORRECT ANSWER✅✅project status review meeting



A high degree of face-to-face communication is especially important early in a project to foster team
building, develop good working relationships, and establish mutual expectations. - CORRECT
ANSWER✅✅TRUE



When preparing for a presentation, knowledge of the audience doesn't matter and neither does the
audience's level of knowledge or familiarity with the subject matter you will be presenting - CORRECT
ANSWER✅✅FALSE

Geschreven voor

Instelling
IME 456
Vak
IME 456

Documentinformatie

Geüpload op
3 februari 2026
Aantal pagina's
6
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STANGRADES Stanford University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
55
Lid sinds
1 jaar
Aantal volgers
1
Documenten
10294
Laatst verkocht
1 dag geleden
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3.4

11 beoordelingen

5
4
4
1
3
3
2
1
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via Bancontact, iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo eenvoudig kan het zijn.”

Alisha Student

Veelgestelde vragen