Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

SWM DEQ Exam Questions With Guaranteed Answers 2026!!!

Document preview thumbnail
Preview 2 out of 13 pages

SWM DEQ Exam Questions With Guaranteed Answers 2026!!!

Content preview

SWM DEQ Exam Questions With Guaranteed Answers 2026!!!

1. The Virginia Stormwater Management Program is au- Virginia Stormwater Man-
thorized by the and administered through the agement Act, Virginia
Stormwater Management
Program Regulation

2. VPDES Permit/Construction GP authorizes discharge greater than or equal to an
of stormwater from construction activities that are acre

3. The Stormwater Management Act requires the State permit, regulate, and con-
Water Control Board to trol stormwater runott

4. DEQ has days to complete review of real or poten- 90
tial inter-jurisdictional impacts upon request

5. The Stormwater Management Act requires the follow- statt of a stormwater pro-
ing individuals to obtain and maintain a certificate of gram, anyone contract-
competency ed by a VSMP authority,
standard and specification
holders

6. The dual certificate will expire three years from the latest date of the cer-
tificates

7. SWM plan must be approved by before land distur- VSMP program authority
bance

8. The water quality criteria sets a site-based load limit 0.41 lbs/acre/year
of of total phosphorus for new development

9. The phosphorus load limit uses the 10% impervious cover

10. Part II B and II C water quantity criteria addresses channel protection and
flood protection



, SWM DEQ Exam Questions With Guaranteed Answers 2026!!!

11. Which two plans in the SWPPP must be approved? SWM plan, ESC plan

12. Does the SWM plan address runoff during or after post-construction
construction?

13. What is the lower limit of the range of imperviousness 10%
that can result in stream degradation?

14. What do land disturbing activities consist of? excavating, clearing,
grading

15. LDA threshold for the SWM Act and Regulation 1 acre or 2500 square
feet for Chesapeake Bay
Preservation Act

16. In situations where an initial exemption was applica- 7 days of commencing the
ble because LDAs were related to emergency work, LDA and shall submit a
VSMP authority shall be advised of the disturbance permit application within
within 30 days of starting the
land-disturbing activity

17. Localities with MS4 must adopt and adminis-
ter a stormwater program

18. Localities without MS4 may choose to administer
a VSMP or have DEQ ad-
minister the program

19. DEQ is responsible for enforcing the while locality Construction GP, VSMP
are responsible for enforcing local ordinances

20. A locality VSMP authority must include enforcement $32,500 per violation per
authority and a schedule of civil penalties for enforce- day

Document information

Uploaded on
January 28, 2026
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ElevatedExcellence
3.8
(175)
Sold
939
Followers
504
Items
18316
Last sold
12 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions