NORAC LATEST PRACTICE GUIDE
UPDATED 2026 TESTED SOLUTIONS
⫸ What is the name of the NORAC signal shown that corresponds to
'Stop and Proceed'? Answer: C1
⫸ What authority is required to perform work with on-track equipment
that disturbs the track or catenary structures? Answer: Foul Time.
⫸ What must engineering employees have with them while on duty?
Answer: An up-to-date copy of the Instruction Book for all Equipment
on the Roadway, Track Safety Standard Part 213, The Operating Rules
and Timetables, and General Road Foreman Notice.
⫸ What is the name of the NORAC signal shown that corresponds to
'Stop Signal'? Answer: C2
⫸ What is the name of the NORAC signal shown that corresponds to
'Slow Approach'? Answer: C4
⫸ What authority must be obtained to operate and test a switch on a
Main Track? Answer: Both b) permission from the Dispatcher and c)
Foul Time permission from the Dispatcher are correct.
UPDATED 2026 TESTED SOLUTIONS
⫸ What is the name of the NORAC signal shown that corresponds to
'Stop and Proceed'? Answer: C1
⫸ What authority is required to perform work with on-track equipment
that disturbs the track or catenary structures? Answer: Foul Time.
⫸ What must engineering employees have with them while on duty?
Answer: An up-to-date copy of the Instruction Book for all Equipment
on the Roadway, Track Safety Standard Part 213, The Operating Rules
and Timetables, and General Road Foreman Notice.
⫸ What is the name of the NORAC signal shown that corresponds to
'Stop Signal'? Answer: C2
⫸ What is the name of the NORAC signal shown that corresponds to
'Slow Approach'? Answer: C4
⫸ What authority must be obtained to operate and test a switch on a
Main Track? Answer: Both b) permission from the Dispatcher and c)
Foul Time permission from the Dispatcher are correct.