1. CESSWI is qualified to preform what inspections? - ANSWER
Construction, post construction, industrial, MS4
2. Clean Water Act year of creation and intent of law - ANSWER 1972,
enacted to restore and maintain the physical, bio, chem integrity of the
waters of the US
3. CWA Section 402 - ANSWER Est. NPDES System, originally focused on
industrial process waste water and POTW
4. CWA Section 404 - ANSWER regulated impacts to waters of the US,
typically associated with a 401 certification
5. CWA Section 401 - ANSWER Regulates water quality impacts and state
cert systems, required permit issued by a federal agency for any activity that
may discharge a pollutant, Applies heavily in industrial sites
6. CWA Section 303 - ANSWER Establishes Water quality standards
7. Stormwater discharge definition - ANSWER stormwater runoff, snow melt
runoff, and surface runoff/drainage
,8. To be subject to NPDES rules, stormwater must: - ANSWER be in a
discernible conveyance
9. Definitions of waters of the US - ANSWER All waters used in interstate or
foreign commerce, including those subject to tidal flows
All interstate waters, including interstate wetlands
All INTRAstate lakes, rivers, streams (intermittent also), mudflats,
sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa
lake, or natural ponds that the destruction of which would affect
interstate/foreign commerce including those which:
Could be used for recreational or other purposes
From which shellfish or fish could be retrieved and sold
Could be used for industrial purposes
All impoundments of water defined by waters of the US by the above
Tributaries of the waters defined above
The territorial sea
Wetlands adjacent to any of the waters defined above
10.Beneficial Uses definition - ANSWER Uses necessary for the survival of
and well-being of people, plants, and wildlife
11.Water quality standards definition - ANSWER state or tribal requirements
that define the water quality goals of a lake stream or other wateerbody by
designation the benefical uses and setting criteria to protect those uses
12.Section 303d - ANSWER est a process for states, territories, and tribes to
i.d. impaired waters, also referred to as water quality limited
,13.TMDL - ANSWER id's the amount of a specific pollutnant that may be
dicharged to a water body, states are responsible for implementing
14.Waste load allocations - ANSWER allocations of pollutant loadings to
point sources
15.TMDL Implementation - ANSWER Define waste load allocation, develop
implementation plan to connect allocations and permits, translate
allocations to permit conditions.
16.Origin of NPDES stormwater regs - ANSWER NURP studies showed
stormwater had many of the same qualities of commercial, industrial areas
17.NPDES Phase I and II regs implemented via - ANSWER General permits
for a group of similar dischagers such as consutruction industry, industrial,
utilities
18.Individual permits for a single entity, facility or project
19.Phase I NPDES Permits ID'd as: - ANSWER Industrial activity
Construction activity <5 acres
Cities over 100k population
20.Phase II NPDES Permits ID'd as: - ANSWER Construction activity 1 - 5
acres
Cities 10k - 100k population
commercial, retail, light industrial, institutional
updated industrial and const. general permits
, 21.Phase II implemented MS4 requirements - ANSWER SWMP with 6
MCMs
Develop measurable program goals
Evaluate effectivness
22.6MCMs - ANSWER Public education/outreach
Public participation and involvement
IDDE
Const. site runoff control
post-construction runoff control
pollution prevention/good housekeeping
23.Components of Permit Compliance - ANSWER NOI
COI
SWPPP
NOT
Record keeping and documentation
24.What A SWPPP Should include - ANSWER Narrative description
potential pollutants (batteries, concrete, etc.)
Size of site
pre and post const runoff coefficients
non stormwater managment measures
permanent post const bmps
waste mgmt ad disposal measres
montitoring and sampling analysis plan