Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

ACI- Concrete Field-Testing Technician - Grade 1 Exam 2026 Most Recent Exam ||Verified Exam!!!||||Actual Complete Real Exam Questions And Correct Answers (Verified Answers) Already Graded A+ ,Guaranteed Success!! Newest Exam!!

Document preview thumbnail
Preview 3 out of 27 pages

ACI- Concrete Field-Testing Technician - Grade 1 Exam 2026 Most Recent Exam ||Verified Exam!!!||||Actual Complete Real Exam Questions And Correct Answers (Verified Answers) Already Graded A+ ,Guaranteed Success!! Newest Exam!!

Content preview

1|Page


ACI- Concrete Field-Testing Technician - Grade 1
Exam 2026 Most Recent Exam ||Verified
Exam!!!||||Actual Complete Real Exam Questions And
Correct Answers (Verified Answers) Already Graded
A+ ,Guaranteed Success!! Newest Exam!!


A maximum temperature of freshly mixed concrete is
specified in ASTM C1064. True of False? - Answers-False


The sample of concrete used for temperature
determination must be rodded 25 times. True or False? -
Answers-False


Sampling by this method is required when tests are to be
made to determine _____ with specification requirements.
- Answers-Compliance


This method covers sampling from four types of mixtures
which are _____, _____, _____, and _____. - Answers-
Stationary mixers, paving mixers, revolving drum mixers,
and open top mixers

,2|Page


The maximum allowable time between obtaining the first
and final portions of a composite sample is _____
minutes. - Answers-15


Portions of a composite sample shall be thoroughly
remixed bfore beginning tests on the sample. True of
False? - Answers-True


The maximum elapsed time allowed between obtaining
the final portion of the composite sample and beginning
the tests for slump, temperature, and air content is _____
minutes. - Answers-5


The molding of strength test specimens shall begin within
_____ minutes after fabricating the composite sample. -
Answers-15


The concrete sample must be protected from
contamination and _____. - Answers-Rapid evaporation


The minimum size sample for making strength test
specimens is _____. - Answers-28 L (1ft^3)

, 3|Page


When sampling from a stationary mixer, the batch must be
sampled at _____ or more regularly spaced intervals
during discharge of the middle portion of the batch -
Answers-2


The composite sample for a paving mixer must represent
a minimum of _____ different portions of the batch of
concrete taken from the pile after discharge. - Answers-5


When sampling from a revolving drum truck mixer,
concrete must be sampled at a minimum of _____
regularly spaced intervals during discharge of the middle
portion of this batch. - Answers-2
The sensor of the temperature measuring device shall be
submerged a minimum of _____ in. [_____mm] into the
freshly mixed concrete. - Answers-3 in. [75 mm]


The temperature measuring device shall have a capacity
of measuring temperature of freshly mixed concrete to +-
_____ degrees F [+- _____ C] throughout a range of
_____. - Answers-1 degree F [0.5 C], 30 degrees F to 120
F [0 C to 50 C]

Document information

Uploaded on
January 16, 2026
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
9
Followers
0
Items
1557
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions