100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

MNO 3701 EXAM PACK

Rating
-
Sold
-
Pages
47
Grade
A+
Uploaded on
16-01-2026
Written in
2025/2026

MNO 3701 EXAM PACK QUESTIONS AND ANSWERS ELABORATIONS

Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Course

Document information

Uploaded on
January 16, 2026
Number of pages
47
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

lOMoAR cPSD| 59244577

, lOMoAR cPSD| 59244577




MNO 3701
EXAM PACK

, lOMoAR
lOMoARcPSD|
cPSD|59244577
59244577




UNIVERSITY EXAMINATIONS




October/November 2024

MNO3701

PRODUCTION AND OPERATIONS MANAGEMENT


70 marks
Duration: four hours


EXAMINERS:


FIRST: PROF A TOLMAY
SECOND: DR A AMADI -ECHENDU



Instructions


• Include the honesty declaration when you upload your portfolio.


• Read through and adhere to all the instruction s for this portfolio.

, lOMoAR cPSD| 59244577




Question 1 [20 x 2 = 40]

Write only the answer to each of the multiple-choice questions provided below (example: 1.1
= a).


1.1 According to the AoN diagram as per the table below, identify the LF for activity E and the EF for
activity F, respectively.
Activity Duration Immediate follower
A 1 B, C, D, E
B 3 F
C 4 F
D 2 F
E 4 F
F 4 G
G 1 -


1 The LF for activity E is 5; the EF for activity F is 4.
2 The LF for activity E is 4; the EF for activity F is 9.
3 The LF for activity E is 4; the EF for activity F is 4.
4 The LF for activity E is 1; the EF for activity F is 1.
5 The LF for activity E is 5; the EF for activity F is 9.


1.2 From the AoN in the answer to question 1, identify the activity or activities with slack.

a activity A b
activity B c activity
Cd activity D e
activity E

1 a
2 b and d
3 b, c and d
4 a, b, c and d 5 None of the above.


1.3 From the AoN in the answer to question 1, identify the critical path(s).

1 A, B, F, G
2 A, C, F, G
3 A, D, F, G
4 A, E, F, G
5 A, C, F G and A, E, F, G
1.4 Material requirements planning (MRP) is used to plan and control material requirements. The
master production schedule (MPS) for three sizes of screwdriver is given in the table below. All
$2.65
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
fisimlawatuwengi

Get to know the seller

Seller avatar
fisimlawatuwengi Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
4 months
Number of followers
0
Documents
14
Last sold
3 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions