Who can issue a stop work order?
c.) building official
Work that usually requires special inspection in the field but is instead performed off-site on the
premises of a fabricator during fabrication...
c.) does not require special inspection if the fabricator is registered and approved
All of the following should be on a daily report except...
a.) astm standard for any testing performed.
The final report shall be submitted...
c.) at a point in time agreed upon by the owner and building official
Discrepancies or nonconforming items shall be brought to the immediate attention of the
a.) contractor
Who has the authority to enforce the special inspection provisions on a job?
a.) contractor
The type and extent of each special inspection and each test shall be located in...
d.) the statement of special inspections
contractor
A person or company responsible for the construction of a building.
building official
An individual charged with the legal authority to review plans and specifications for code
compliance.
approved inspection agency
An organization authorized to conduct inspections and ensure compliance with building codes.
registered design professional
A qualified individual responsible for submitting revised plans to the building official for
approval.
,special inspector
A professional who checks in with the contractor upon arriving at the job site.
preconstruction conference meeting
A meeting aimed at reviewing the Special Inspection agreement and schedule requirements.
final report
A document submitted to the building department by the inspection agency or special
inspector.
nonconformance inspection report
A report that should include information about discrepancies but not the name of the project
owner.
approved agency
An entity responsible for keeping records of special inspections and tests performed during
construction.
quality assurance
Another name for special inspection.
Engineer
A professional employed by an owner to perform structural observations.
Statement of Special Inspections
A document prepared by the RDP in charge when special inspection is required.
competency of the special inspector
Determined by the building official for the work they will be performing.
contractor's duties
Include providing access to the approved construction plans and maintaining evidence of an
onsite quality control plan.
discrepancies
Issues that shall be brought to the immediate attention of the contractor for correction.
special inspection
,Includes incidents of complex materials, critical structural components, and life or fire safety
systems.
building official's responsibilities
Includes reviewing plans and specifications for code compliance.
approved inspection agency's report
Shall contain written records of site visits made by the structural observer.
RDP in responsible charge
The individual responsible for overseeing the project and ensuring compliance with regulations.
Building official
The authority who has the right to waive special inspection requirements for work deemed
minor in nature.
Approved agency
An entity that the contractor is permitted to employ when the contractor is also the owner.
Non conforming item
An item that, if not resolved in a timely manner, should notify the RDP in responsible charge and
the building official.
Special inspector's progress reports
Reports that should contain all but recommendations for structural improvements.
Final inspection
The inspection performed by the building official after reviewing and approving the final special
inspection report.
Special inspector
An individual who notifies the contractor upon arrival to the job site.
Final report submission
The point at which the special inspection approved agency submits their final report, agreed
upon by the owner and the building official prior to the start of the project.
Structural observations
, Observations that may require separate special inspections according to the International
Building Code.
Stop work order
An order issued that can only be lifted by the building official who has the authority to issue
approval for work to proceed.
Special inspector responsibilities
The special inspector should consult with the foreman or supervisor on technical matters that
may arise.
Structural observations employment
The building owner shall employ an engineer to perform structural observations.
Non destructive testing (NDT)
Personnel must be qualified in accordance with criteria of AWS D1.1 and ASNT SNT-TC-1A or
ANSI/ASNT CP-189.
Special inspection during fabrication
Not required when work is done at an approved fabricator's facility.
Special inspector experience
Relevant when the documented experience or training is related in complexity to work to be
performed.
Construction accessibility
Construction requiring special inspection must remain accessible and exposed until completion
of required special inspections or tests.
Special Inspectors
Individuals responsible for overseeing specific aspects of construction to ensure compliance
with regulations.
Objective, Competent, and Independent from the contractor
Requirements that a Special Inspection Agency must show to be approved by the building
department.
Approved Special Inspection Agencies
Entities that shall keep records of special inspections and tests.