Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

CMIT Exam 2026–2027 | Updated Practice Questions, Answers & Study Guide

Note
-
Vendu
-
Pages
105
Qualité
A+
Publié le
13-01-2026
Écrit en
2025/2026

Prepare for the CMIT Exam with a comprehensive 2026–2027 updated study guide designed to reinforce core information technology and management concepts. This resource includes high-quality practice questions with correct answers and detailed explanations to support exam readiness. Key topics include IT infrastructure, cybersecurity fundamentals, systems management, data handling, and professional best practices. Ideal for candidates seeking a structured and effective CMIT exam review to boost confidence and achieve success.

Montrer plus Lire moins











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Infos sur le Document

Publié le
13 janvier 2026
Nombre de pages
105
Écrit en
2025/2026
Type
Examen
Contenu
Questions et réponses

Sujets

Aperçu du contenu

1|Page


CMIT Exam (NEW UPDATED VERSION) LATEST ACTUAL EXAM QUESTIONS AND
CORRECT ANSWERS (VERIFIED QUESTIONS AND ANSWERS)- GUARANTEED PASS
A+ UPDATED 2026




A CM's role and responsibilities are governed solely by the Owner/CM Agreement.

True False - CORRECT ANSWER True



QUESTION : There are two basic forms of CM, agency and at-risk. Each form provides for the
basic services of construction management practice. However, there are some key
differences. Which of the following do not apply to both CM forms?
A) Both forms provide advice to the owner on constructibility, budget and the schedule.
B) Both require that the liabilities and risks assumed by the parties be clearly understood,
coordinated, and stated in the respective contracts.
C) Both forms allow the CM to function in an advisory role for the entire engagement of the
CM.
D) Services can vary based on the contractual relationships of the parties and the risks that
are assumed. - CORRECT ANSWER C) Both forms allow the CM to function in an
advisory role for the entire engagement of the CM.


QUESTION : Construction management had its beginnings in the early to mid-1960's. Which
of the following factors contributed to the initial use of this delivery system?
A) The need to reduce the overall time and cost associated with project delivery.
B) The increasing cost of money and the unpredictability of project funding streams.
C) The changing role of the general contractor and the increasing numbers of specialty trade
contractors.

D) All of the above. - CORRECT ANSWER D) All of the above.




2026 2027 GRADED A+

,2|Page


QUESTION : The General Services Administration was the first federal agency to use
construction management. - CORRECT ANSWER True



QUESTION : The General Services Administration, the Department of Health, Education and
Welfare (now HHS), and the Veterans Administration ran into similar difficulties in the use of
construction management. Which of the following was/were common problems for all three
agencies?
A) Funding restrictions
B) Claims
C) Change conditions

D) All of the above - CORRECT ANSWER D) All of the above



QUESTION : CMAA was formed and incorporated 1982 with its primary focus being the
growth and development of the construction management profession. - CORRECT
ANSWER True



QUESTION : The CMAA Construction Management Standards of Practice is intended as a
guide to the range of services that constitute professional construction management. They
seek to meet the documented need for definitions of what construction management services
are, without unduly structuring the methodologies by which those services are provided by
the CM. - CORRECT ANSWER True



QUESTION : The goals of the Construction Management Association of America (CMAA)
include:
A) Setting standards and developing contract documents for construction management
practice.
B) Expanding the understanding of the construction management concept and its use in the
marketplace.
C) Advocacy for construction management in the legislative, regulatory, and judicial arenas of
federal, state, and local governments.

D) All of the above. - CORRECT ANSWER D) All of the above



2026 2027 GRADED A+

,3|Page




QUESTION : The fact that an individual is certified or licensed in any other profession does
not, per se, establish him/her as a qualified CM.

True False - CORRECT ANSWER True



QUESTION : Certification as a CM means the construction management practitioner has
"state of the art" knowledge and capability to practice construction management.

True False - CORRECT ANSWER False



QUESTION : Recruiting and training are business matters and normally do not involve ethical
concerns.

True False - CORRECT ANSWER False



QUESTION : Construction management is a concept that is susceptible to overselling.

True False - CORRECT ANSWER True



QUESTION : Failure to provide quality services is a business and not an ethical question.

True False - CORRECT ANSWER False



QUESTION : Contracting for adequate fees is both a business and an ethical issue.

True False - CORRECT ANSWER True



QUESTION : The ethics of the CM profession focus primarily on a CM's relationships in dealing
with its clients.

True False - CORRECT ANSWER True



QUESTION : The possible approaches for delivering a project are virtually unlimited. A key
reason for such variations is:



2026 2027 GRADED A+

, 4|Page


A) The different roles that can be assumed by project participants.
B) Different forms of contracts and methods of compensation that can be used.
C) The different levels of care, responsibility, and risks assumed by the parties involved.

D) All of the above. - CORRECT ANSWER D) All of the above



QUESTION : The traditional delivery system is characterized by executing the major phases of
a project in:
A) An overlapping concept
B) A linear sequence
C) A fast track method

D) All of the above - CORRECT ANSWER B) A linear sequence



QUESTION : A key advantage of the traditional delivery approach is:
A) With the traditional delivery system, the cost of the construction phase is known before
construction starts.
B) Facility features are fully determined & specified.
C) When the construction contract is signed, the major risk belongs to the contractor.

D) All of the above - CORRECT ANSWER B) Facility features are fully determined &
specified.


QUESTION : Design-build and at-risk construction management delivery systems allow the
option to fast-track or phase a project.

True False - CORRECT ANSWER True



QUESTION : Most definitions of construction management are similar. However, a contractual
definition is not known until:
A) The legal form of the CM contract is chosen.
B) The specific scope of services to be provided is identified.



2026 2027 GRADED A+
$23.99
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
GEO808 nursing
Voir profil
S'abonner Vous devez être connecté afin de pouvoir suivre les étudiants ou les formations
Vendu
1387
Membre depuis
4 année
Nombre de followers
1123
Documents
9914
Dernière vente
20 heures de cela
Top Nursing Exam Resources

Hi! I’m a nursing student who creates clear, accurate, and exam-ready study materials for ATI, NCLEX, and core nursing courses. My uploads include complete summaries, verified exam answers, and organized notes designed to save you time and boost your scores. Everything in my store is updated, easy to follow, and built to help you study smarter, not harder.

3.8

221 revues

5
107
4
35
3
36
2
11
1
32

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions