Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4,6 TrustPilot
logo-home
Examen

Project Management Exam 2026–2027 | Updated Practice Questions, Answers & Study Guide

Note
-
Vendu
-
Pages
134
Grade
A+
Publié le
13-01-2026
Écrit en
2025/2026

Prepare for the Project Management exam with an updated 2026–2027 study guide designed to strengthen core project management knowledge and exam readiness. This resource includes high-quality practice questions with correct answers and detailed explanations aligned with current project management standards. Key topics include project life cycle, scope, schedule, cost, risk, quality, and stakeholder management. Ideal for students and professionals seeking a structured and effective project management exam review to achieve top results.

Montrer plus Lire moins











Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

Infos sur le Document

Publié le
13 janvier 2026
Nombre de pages
134
Écrit en
2025/2026
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

1|Page




Project Management (NEW UPDATED VERSION) LATEST ACTUAL EXAM
QUESTIONS AND CORRECT ANSWERS (VERIFIED QUESTIONS AND ANSWERS)-
GUARANTEED PASS A+ UPDATED 2026




Project - CORRECT ANSWER A temporary endeavor undertaken to create a
unique product service or result

QUESTION : Management - CORRECT ANSWER Act ot coordinating the efforts
of people to accomplish desired goals and objectives using available resources (eg.
Money, workers, equipment, manpower)

Includes:
-Identifying requirements
-Establishing clear and achievable objectives
-Balancing the competing demands for quality, scope time and cost
-Adapting specifications, plans and concerns for the stakeholders

QUESTION : PM Characteristics - CORRECT ANSWER 1. Management is goal
oriented process
2. Multidimensional (work, people and operations)
3. A continuous process
4. Group activity
5. Dynamic function
6. Intangible force

QUESTION : Knowledge Areas - CORRECT ANSWER Scope Management
Time management
Cost management
Stakeholder management
Human resource management
Communication management
Procurement management
Risk management
Quality management
Integration management




2026 2027 GRADED A+

,2|Page


QUESTION : Project management - CORRECT ANSWER Checking planning,
organizing, motivating and controlling resources to achieve specific goals

Application of:
knowledge, skills, tools and techniques
to protect activities to meet or exceed stakeholders' expectations while using resources
efficiently and effectively

QUESTION : Project Life Cycle - CORRECT ANSWER Defines the phases that
connects the beginning of a project to its end
A project is unique

Details: Raw material extraction and processing, project manufacturing, distribution,
use, end of life

Recycle, Remanufacture, reuse/super-use

QUESTION : Direct Cost - CORRECT ANSWER Energy, materials, labor, time,
other resources

QUESTION : Indirect cost and overheads - CORRECT ANSWER Waste,
environmental damage, land use, social issues, other effects.

QUESTION : Project Phases Summary - CORRECT ANSWER

QUESTION : Initiation - CORRECT ANSWER Requirements:
-Scope
-Duration/Start
-Location
-Budget

People Involved:
-Client
-Owner
-Consultant
-PM

QUESTION : Design Phase - CORRECT ANSWER Requirements:
-Details
-Conceptual arch drawing
-Equipment
-Materials
-Technical issues (mechanical, structure)
-Drawings, materials, specs



2026 2027 GRADED A+

,3|Page


People Involved:
-Consultant
-Owner

QUESTION : Planning Phase - CORRECT ANSWER Requirements:
-Scheduling
-Plan

People Involved
-Eng
-Arch
-Civil Engineer
- Mechanical and Electrical
-PM

QUESTION : Bidding Phase - CORRECT ANSWER Requirements:
-Formal contract documents
-Contractor appointing
-Municipality approval

People involved:
-Owner
-Consultant
-PM

QUESTION : Execution Phase - CORRECT ANSWER Requirements:
-Monitoring and control for activities and processes
-Procurement
-Progress completion/payment

People involved:
-Owner
-Supervision
-Consultant
-Contractor
-PM

QUESTION : Closing Phase - CORRECT ANSWER Requirements:
-Warranty Period
-Maintenance
-Lessons learned
-Asbuilt drawings
-Checklist

People involved:
-Owner


2026 2027 GRADED A+

, 4|Page


-Supervision
-Consultant
-Contractor
-PM

QUESTION : Projects - CORRECT ANSWER Performed by people
Constrained by limited resources
Planned, executed and controlled
Temporary
Unique

QUESTION : Operations - CORRECT ANSWER Performed by people
Constrained by limited resources
Planned, executed and controlled
Ongoing
Repetitive

QUESTION : Primary objectives - CORRECT ANSWER Time, Quality, Cost

QUESTION : Secondary objectives - CORRECT ANSWER Flexibility,
sustainability, cost, risk, responsibility, certainty, complexity

QUESTION : Relation between primary and secondary objectives - CORRECT
ANSWER Time: flexibility, sustainability
Cost: risk, responsibility
Quality: certainty, complexity

QUESTION : PM Triple constraints - CORRECT ANSWER Time, cost, scope

QUESTION : Frederick Taylor - CORRECT ANSWER analyzed work patterns and
behavior and found out that better methods can increase the productivity

QUESTION : Henry Gantt - CORRECT ANSWER Studied the order of work
operations in great detail
Developed charts which details the progress in large projects
Charts used ever since

QUESTION : Project Management Institute - CORRECT ANSWER 1969
-Launched to promote project management as its own profession
-Advocacy for the profession, setting professional standards, conducting research,
providing access to info and resources
260,000 members
171 countries



2026 2027 GRADED A+
$28.49
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
GEO808 nursing
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
1387
Membre depuis
4 année
Nombre de followers
1123
Documents
9914
Dernière vente
21 heures de cela
Top Nursing Exam Resources

Hi! I’m a nursing student who creates clear, accurate, and exam-ready study materials for ATI, NCLEX, and core nursing courses. My uploads include complete summaries, verified exam answers, and organized notes designed to save you time and boost your scores. Everything in my store is updated, easy to follow, and built to help you study smarter, not harder.

3.8

221 revues

5
107
4
35
3
36
2
11
1
32

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions