If unused mortar stiffens due to hydration of cement, what must you do? - correct answer- Discard the
v v v v v v v v v v v v v v v v v
mortar
v
What minimum time must you wait before caulking or grouting new tiles? - correct answer-24-48 Hours
v v v v v v v v v v v v v v v
How longPshould you wait before installing tile on a shower pan? - correct answer-24 Hours
v v v v v v v v v v v v v v
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater t han
v v v v v v v v v v v v v v v
0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - correct answer-Type-B Soils
v v v v v v v v v v v v v v v v
If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each light? - correct
v v v v v v v v v v v v v v v v v v v v
answer-35V
v
In a series circuit, the total voltage is divided equally.
v v v v v v v v v
For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: - correct
v v v v v v v v v v v v v v v v v v v v
answer-1:1 (45°)
v v
APPittsburgh joint is used in: - correct answer-HVAC ductwork v v v v v v v v
The drain for a pressurePrelief valve on a water heater should be extended to: - correct answer- The
v v v v v v v v v v v v v v v v v
outside of the building
v v v v
What is the minimum slope toward the drain of a shower pan? - correct answer-1/4" per foot (2%)
v v v v v v v v v v v v v v v v v
What is the diameter of #3 rebar? - correct answer-3/8"
v v v v v v v v v
,If a vendor fails to provide an MSDS, you have the right to call: -Pcorrect answer-Cal/OSHA or DOSH
v v v v v v v v v v v v v v v v v
When installing a door jamb, you need shims at: -Pcorrect answer- Both
v v v v v v v v v v v
hinge and strike sides, three on each side.
v v v v v v v v
Which of the following is used to adhere vinyl floors?
v v v v v v v v v
A. Epoxy cement v
B. Asphalt mastic v
C. Latexprimer v
D. White glue - correct answer-Epoxy cement v v v v v
When do you need bracing for a drywall wall? - correct answer-
v v v v v v v v v v v
Diagonal bracing is needed every 25' for any drywall wall.
v v v v v v v v v v
How should you clear the roots from a construction site? - correct answer- Clear
v v v v v v v v v v v v v
roots to 12" below grade.
v v v v v
Dividingwatts by amps gives you: - correct answer-Volts
v v v v v v v v
The most frequent on-the-job roofing accidents are: - correct answer-Falls
v v v v v v v v v
Which of the following is NOT a type of wood block flooring?
v v v v v v v v v v v
A. Parquet
B. WoodMosaic v
C. WoodTile v
D. All of the above. - correct answer-Wood tile
v v v v v v v
,Lightweight concrete is best used for: v v v v v
A. Curb and Gutter v v
B. Second floor decking v v
C. FirstPfloor slab on grade v v v
D. Footings - correct answer-Second floor decking
v v v v v
The tool used to carry grout needed to patch a small hole is a:
v v v v v v v v v v v v v
A. Hawk
B. Poling board v
C. Spot board v
D. Mason's scutch - correct answer-Spot Board
v v v v v
Which pipe is NOT appropriate for industrial wastes?
v v v v v v v
A. Cast iron v
B. Schedule 40 ABS DWV v v v
C. Extra strength vitrified clay
v v v
D. Copper -Pcorrect answer-Copper v v
Where do you need a fire wall?
v v v v v v
A. Between a livingProom and a bedroom v v v v v
B. Between a bedroom and a bathroom v v v v v
C. Between a kitchen and a bath v v v v v
D. A separation wall between a dwelling and an attachment - correct answer- A
v v v v v v v v v v v v
separation wall between a dwelling and an attachment.
v v v v v v v v
, What is the minimum clearance between rough ground and untreated subfloor joists? - correct answer- 18
v v v v v v v v v v v v v v v
inches
v
Who may remove asbestos? - correct answer-Contractor with Asbestos Certificationon license.
v v v v v v v v v v v
Which of the following is NOT likely to be found in significant proportions in granular soil?
v v v v v v v v v v v v v v v
A. Gravel
B. Sand
C. Silt
D. Clay - correct answer-Clay
v v v
Stiles and rails are used on which of the following?
v v v v v v v v v
A. Furred walls v
B. Roofs
C. Windows
D. Slabs - correct answer-Windows.
v v v
A stile is the vertical edges of the window and the railsPare the bottom and top.
v v v v v v v v v v v v v v v
What does a high slump test indicate? - correct answer-Too much water.
v v v v v v v v v v v
Metal concrete forms should be?
v v v v
A. Oiled
B. Watered
C. Placed against gravel v v
D. Discarded after each use - correct answer-Oiled v v v v v v
CONTRACTOR 2024-2025EXAMQUESTIONS v v v
WITH 100% CORRECT ANSWERS
v v v v
If unused mortar stiffens due to hydration of cement, what must you do? - correct answer- Discard the
v v v v v v v v v v v v v v v v v
mortar
v
What minimum time must you wait before caulking or grouting new tiles? - correct answer-24-48 Hours
v v v v v v v v v v v v v v v
How longPshould you wait before installing tile on a shower pan? - correct answer-24 Hours
v v v v v v v v v v v v v v
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater t han
v v v v v v v v v v v v v v v
0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - correct answer-Type-B Soils
v v v v v v v v v v v v v v v v
If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each light? - correct
v v v v v v v v v v v v v v v v v v v v
answer-35V
v
In a series circuit, the total voltage is divided equally.
v v v v v v v v v
For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: - correct
v v v v v v v v v v v v v v v v v v v v
answer-1:1 (45°)
v v
APPittsburgh joint is used in: - correct answer-HVAC ductwork v v v v v v v v
The drain for a pressurePrelief valve on a water heater should be extended to: - correct answer- The
v v v v v v v v v v v v v v v v v
outside of the building
v v v v
What is the minimum slope toward the drain of a shower pan? - correct answer-1/4" per foot (2%)
v v v v v v v v v v v v v v v v v
What is the diameter of #3 rebar? - correct answer-3/8"
v v v v v v v v v
,If a vendor fails to provide an MSDS, you have the right to call: -Pcorrect answer-Cal/OSHA or DOSH
v v v v v v v v v v v v v v v v v
When installing a door jamb, you need shims at: -Pcorrect answer- Both
v v v v v v v v v v v
hinge and strike sides, three on each side.
v v v v v v v v
Which of the following is used to adhere vinyl floors?
v v v v v v v v v
A. Epoxy cement v
B. Asphalt mastic v
C. Latexprimer v
D. White glue - correct answer-Epoxy cement v v v v v
When do you need bracing for a drywall wall? - correct answer-
v v v v v v v v v v v
Diagonal bracing is needed every 25' for any drywall wall.
v v v v v v v v v v
How should you clear the roots from a construction site? - correct answer- Clear
v v v v v v v v v v v v v
roots to 12" below grade.
v v v v v
Dividingwatts by amps gives you: - correct answer-Volts
v v v v v v v v
The most frequent on-the-job roofing accidents are: - correct answer-Falls
v v v v v v v v v
Which of the following is NOT a type of wood block flooring?
v v v v v v v v v v v
A. Parquet
B. WoodMosaic v
C. WoodTile v
D. All of the above. - correct answer-Wood tile
v v v v v v v
,Lightweight concrete is best used for: v v v v v
A. Curb and Gutter v v
B. Second floor decking v v
C. FirstPfloor slab on grade v v v
D. Footings - correct answer-Second floor decking
v v v v v
The tool used to carry grout needed to patch a small hole is a:
v v v v v v v v v v v v v
A. Hawk
B. Poling board v
C. Spot board v
D. Mason's scutch - correct answer-Spot Board
v v v v v
Which pipe is NOT appropriate for industrial wastes?
v v v v v v v
A. Cast iron v
B. Schedule 40 ABS DWV v v v
C. Extra strength vitrified clay
v v v
D. Copper -Pcorrect answer-Copper v v
Where do you need a fire wall?
v v v v v v
A. Between a livingProom and a bedroom v v v v v
B. Between a bedroom and a bathroom v v v v v
C. Between a kitchen and a bath v v v v v
D. A separation wall between a dwelling and an attachment - correct answer- A
v v v v v v v v v v v v
separation wall between a dwelling and an attachment.
v v v v v v v v
, What is the minimum clearance between rough ground and untreated subfloor joists? - correct answer- 18
v v v v v v v v v v v v v v v
inches
v
Who may remove asbestos? - correct answer-Contractor with Asbestos Certificationon license.
v v v v v v v v v v v
Which of the following is NOT likely to be found in significant proportions in granular soil?
v v v v v v v v v v v v v v v
A. Gravel
B. Sand
C. Silt
D. Clay - correct answer-Clay
v v v
Stiles and rails are used on which of the following?
v v v v v v v v v
A. Furred walls v
B. Roofs
C. Windows
D. Slabs - correct answer-Windows.
v v v
A stile is the vertical edges of the window and the railsPare the bottom and top.
v v v v v v v v v v v v v v v
What does a high slump test indicate? - correct answer-Too much water.
v v v v v v v v v v v
Metal concrete forms should be?
v v v v
A. Oiled
B. Watered
C. Placed against gravel v v
D. Discarded after each use - correct answer-Oiled v v v v v v